ANGRA 3
Der dritte Reaktor des brasilianischen Kernkraftwerks Angra dos Reis sollte zusammen mit Angra 2 die deutsche Kernkrafttechnik nach Brasilien bringen. Für den Druckwasserreaktor der Kraftwerk Union wurden schon in den 1980er-Jahren große Komponenten gefertigt. Nach wiederholten Bauunterbrechungen ist die Anlage auch 2026 nicht fertiggestellt. Über die Finanzierung und Fortsetzung des Projekts wird weiter verhandelt.
The third reactor at Brazil's Angra dos Reis nuclear power station was intended, together with Angra 2, to bring German nuclear technology to Brazil. Major components for the Kraftwerk Union pressurised water reactor had already been manufactured in the 1980s. After repeated interruptions, the plant remains unfinished in 2026. Negotiations over financing and whether to continue the project are ongoing.
Ein Reaktor aus den siebziger Jahren
Angra 3 wurde im Rahmen des deutsch-brasilianischen Atomabkommens von 1975 zusammen mit Angra 2 bestellt. Die Kraftwerk Union (KWU) lieferte die Technik für zwei große Druckwasserreaktoren mit vier Hauptkühlmittelkreisläufen. Als Vorbild diente Grafenrheinfeld; Angra 3 ist ein Vor-Konvoi-Reaktor der deutschen KWU-Entwicklung.
In den 1980er-Jahren wurden wesentliche Teile des Reaktors bereits hergestellt und nach Brasilien geliefert, darunter der Reaktordruckbehälter, Dampferzeuger, Druckhalter und Hauptkühlmittelpumpen. Die Bauarbeiten am Standort begannen 1984, wurden aber wenig später unterbrochen. Die für Angra 3 vorgesehenen Komponenten mussten über Jahrzehnte konserviert und regelmäßig überprüft werden.
Jahrzehnte im Lager
Erst 2010 wurden die Bauarbeiten in größerem Umfang wieder aufgenommen. Die Fertigstellung schien nun erreichbar, doch Finanzierungsprobleme und die Korruptionsaffäre um den Bau brachten das Vorhaben erneut zum Erliegen. Im Juli 2015 wurde der damalige Eletronuclear-Präsident, der pensionierte Admiral Othon Luiz Pinheiro da Silva, im Rahmen der Operation Lava Jato festgenommen. Die Ermittler warfen ihm die Annahme von Bestechungsgeldern im Zusammenhang mit Aufträgen für Angra 3 vor. Er wurde 2016 in erster Instanz verurteilt. Zuvor hatte Othon Luiz Pinheiro da Silva eine zentrale Rolle beim Aufbau des brasilianischen Marineprogramms zur Urananreicherung gespielt. 2015 kamen die Bauarbeiten weitgehend zum Erliegen.
Für die Ausrüstung ergab sich damit ein außergewöhnliches technisches Problem. Bauteile, die lange vor der Inbetriebnahme gefertigt worden waren, mussten hinsichtlich ihres Erhaltungszustands, ihrer Dokumentation und der inzwischen veränderten Sicherheitsanforderungen erneut bewertet werden. Die Internationale Atomenergie-Organisation behandelte Angra 3 deshalb ausdrücklich als Fallbeispiel für das Alterungsmanagement während eines unterbrochenen Kraftwerksbaus.
Ein Kraftwerk ohne Fertigstellungstermin
2022 wurde nochmals ein begrenzter Teil der Bauarbeiten aufgenommen; auch dieser Anlauf kam ins Stocken. Im Februar 2026 beanstandete das brasilianische Bundesrechnungstribunal Lücken in den Ausschreibungs- und Finanzierungsunterlagen für die noch ausstehenden Leistungen. Die Kosten für die Fertigstellung wurden auf rund 20 Milliarden Real geschätzt. Im Juli 2026 blieb eine grundsätzliche Entscheidung des staatlichen Energierats über die Fortsetzung aus. Für Kredite der staatlichen Entwicklungsbank BNDES wurde Anfang September ein Zahlungsaufschub bis Ende 2027 vereinbart.
Ein Fertigstellungstermin steht nicht fest (Stand Oktober 2026).
A reactor from the 1970s
Angra 3 was ordered alongside Angra 2 under the 1975 German–Brazilian nuclear agreement. Kraftwerk Union (KWU) supplied the technology for two large pressurised water reactors with four primary coolant loops. Grafenrheinfeld served as the reference design; Angra 3 is a pre-Konvoi reactor developed by Germany's KWU.
Major reactor components were manufactured and delivered to Brazil in the 1980s, including the reactor pressure vessel, steam generators, pressuriser and main coolant pumps. Construction work at the site began in 1984 but was suspended shortly afterwards. Components intended for Angra 3 had to be preserved and inspected regularly over decades.
Decades in storage
Substantial construction work did not resume until 2010. Completion now seemed attainable, but financing problems and a corruption scandal surrounding the project brought work to another halt. In July 2015, Eletronuclear's then president, retired Admiral Othon Luiz Pinheiro da Silva, was arrested as part of Operation Lava Jato. Investigators accused him of accepting bribes in connection with contracts for Angra 3. He was convicted at first instance in 2016. Othon Luiz Pinheiro da Silva had previously played a central role in establishing the Brazilian navy's uranium-enrichment programme. By 2015, construction had largely stopped.
This created an unusual technical challenge for the equipment. Components manufactured long before commissioning had to be reassessed in terms of their condition, documentation and safety requirements that had changed in the meantime. The International Atomic Energy Agency therefore explicitly treated Angra 3 as a case study in ageing management during an interrupted power-station construction project.
A power station without a completion date
A limited amount of construction resumed in 2022, but this attempt also stalled. In February 2026, Brazil's federal audit court identified shortcomings in the tendering and financing documents for the outstanding work. Completion costs were estimated at around 20 billion reais. In July 2026, the state energy council had yet to reach a fundamental decision on whether to continue. In early September, a deferral of payments on loans from the state development bank BNDES was agreed until the end of 2027.
There is no confirmed completion date (as at October 2026).
- Reaktortyp
- Druckwasserreaktor
- Bauart / Modell
- Vor-Konvoi
- Hersteller
- Kraftwerk Union (KWU)
- Leistung thermisch
- 3.900 MW (aktuelle Datenbankangabe)
- Leistung elektrisch
- 1.405 / 1.340 MW
- Primärkreisläufe
- 4
- Baubeginn
- 1984
- Status
- unvollendet
- Baustopp: Mitte der 1980er-Jahre; erneuter Baustopp 2015
- Wiederaufnahme größerer Bauarbeiten: 2010
- Status (Oktober 2026): unvollendet, Fortsetzung nicht abschließend beschlossen
- Reactor type
- Pressurised water reactor
- Design / model
- Pre-Konvoi
- Manufacturer
- Kraftwerk Union (KWU)
- Thermal output
- 3,900 MW (current database figure)
- Electrical output
- 1,405 / 1,340 MW
- Primary coolant loops
- 4
- Construction began
- 1984
- Status
- Unfinished
- Construction suspended: mid-1980s; further suspension in 2015
- Substantial construction resumed: 2010
- Status (October 2026): unfinished; continuation not definitively decided
Glossar:Glossary:
Druckwasserreaktor (DWR)
Leichtwasserreaktor, in dem Wasser unter einem Druck von etwa 150 bis 160 bar durch den Reaktorkern strömt, ohne dort zu sieden. Es kühlt die Brennelemente und bremst als Moderator die Neutronen. Über Dampferzeuger gibt der geschlossene Primärkreislauf seine Wärme an einen getrennten Sekundärkreislauf ab, dessen Dampf die Turbine antreibt. Die beiden Wasserkreisläufe vermischen sich nicht; im Normalbetrieb bleibt das radioaktive Reaktorkühlmittel vom Turbinenkreislauf getrennt. Ein Druckhalter stabilisiert den Druck im Primärkreislauf.
Das Konzept wurde in den USA zunächst für den Antrieb von U-Booten entwickelt. Unter Leitung von Hyman G. Rickover entstand bei Westinghouse der Reaktor für die USS Nautilus, die 1954 in Dienst gestellt wurde und 1955 erstmals mit Kernenergie fuhr. Im Kraftwerk Shippingport ging 1957 ein Druckwasserreaktor zur Stromerzeugung ans Netz. Siemens übernahm die amerikanische Technik; die Kraftwerk Union (KWU) entwickelte daraus die westdeutsche Linie bis zum Konvoi. Dessen Entwicklung floss zusammen mit der französischen N4-Baureihe in den Europäischen Druckwasserreaktor EPR ein. Die sowjetischen und russischen WWER bilden eine eigenständige Druckwasserreaktorlinie – auf der Karte vertreten durch Rheinsberg, Greifswald und das nicht fertiggestellte Kernkraftwerk Stendal.
Glossar:Glossary:
Pressurised Water Reactor (PWR)
A light-water reactor in which water flows through the reactor core at a pressure of approximately 150–160 bar without boiling. It cools the fuel assemblies and acts as a moderator, slowing the neutrons. The closed primary circuit transfers its heat through steam generators to a separate secondary circuit, whose steam drives the turbine. The water in the two circuits does not mix; under normal operating conditions, the radioactive reactor coolant remains separate from the turbine circuit. A pressuriser stabilises the pressure in the primary circuit.
The concept was originally developed in the United States for submarine propulsion. Under the direction of Hyman G. Rickover, Westinghouse developed the reactor for the USS Nautilus, which entered service in 1954 and made its first nuclear-powered voyage in 1955. A pressurised water reactor at Shippingport began supplying electricity to the grid in 1957. Siemens adopted the American technology; Kraftwerk Union (KWU) developed it into the West German reactor line culminating in the Konvoi. Together with the French N4 series, this design development contributed to the European Pressurised Reactor (EPR). The Soviet and Russian WWER reactors represent an independent pressurised water reactor line, represented on the map by Rheinsberg, Greifswald and the unfinished Stendal nuclear power station.