ATUCHA I
Atucha I war das erste Kernkraftwerk Lateinamerikas. Der von Siemens errichtete Schwerwasser-Druckwasserreaktor erreichte 1974 die Kritikalität und lieferte im selben Jahr Strom. Ein ungewöhnlicher Reaktorkern mit senkrechten Brennstoffkanälen erlaubt den Brennelementwechsel während des Betriebs. Seit September 2024 wird die Anlage für eine weitere Betriebsdauer von rund 20 Jahren modernisiert.
Atucha I was Latin America's first nuclear power station. The Siemens-built heavy-water pressurised reactor achieved criticality in 1974 and supplied electricity that same year. Its unusual core, with vertical fuel channels, permits refuelling while the reactor is operating. Since September 2024, the plant has been undergoing modernisation to extend its operating life by approximately 20 years.
Wie bei einem gewöhnlichen Druckwasserreaktor befindet sich der gesamte Kern von Atucha I in einem massiven Druckbehälter. Innerhalb dieses Behälters stehen jedoch 252 senkrechte Brennstoffkanäle in einem Tank mit schwerem Wasser. Kühlmittel und Moderator sind ebenfalls schweres Wasser, werden aber in getrennten Kreisläufen mit unterschiedlichen Temperaturen geführt. Die Brennelemente können mit einer speziellen Maschine von oben ausgetauscht werden, ohne den Reaktor dafür abzuschalten. Das unterscheidet Atucha von den meisten westlichen Druckwasserreaktoren.
Atucha I wurde am 13. Januar 1974 erstmals kritisch und speiste am 19. März erstmals Strom ein. Am 24. Juni wurde das Kraftwerk in Anwesenheit des argentinischen Präsidenten Juan Domingo Perón eröffnet; an diesem Tag begann auch der kommerzielle Betrieb. Zunächst verwendete es Natururan. 1983 lieferte die argentinische Brennelementefabrik CONUAR am Forschungszentrum Ezeiza erstmals im Land gefertigte Brennelemente für Atucha I. Seit 2001 wird Brennstoff mit einer geringen Anreicherung von 0,85 Prozent Uran-235 eingesetzt, wodurch längere Nutzungszeiten der Brennelemente möglich wurden.
Im August 1988 beschädigte das gebrochene Führungsrohr einer Wasserstandssonde einen Brennstoff-Kühlkanal samt Brennelement und weitere Einbauten im Reaktor. Der Block wurde abgeschaltet. Für die Untersuchung und Reparatur entwickelten argentinische Ingenieure besondere Werkzeuge, mit denen sie die beschädigten Teile tief im Druckbehälter durch enge Öffnungen erreichen konnten. Die Arbeiten dauerten rund 17 Monate; am 8. Januar 1990 wurde Atucha I wieder angefahren. In den folgenden Betriebsjahren wurden auch die Brennstoffkanäle schrittweise erneuert.
Ende September 2024 wurde der Block für eine umfassende Lebensdauerverlängerung vom Netz genommen. Er wird unter anderem an zentralen Anlagenkomponenten und Sicherheitssystemen überarbeitet. Im Juli 2026 waren nach Betreiberangaben rund 60 Prozent der Arbeiten abgeschlossen; die Rückkehr ans Netz wird für die zweite Hälfte 2027 erwartet. Die Modernisierung soll einen weiteren Betrieb um etwa zwei Jahrzehnte ermöglichen (Stand Oktober 2026).
As in a conventional pressurised water reactor, the entire core of Atucha I sits inside a massive pressure vessel. Within this vessel, however, 252 vertical fuel channels stand in a tank of heavy water. Both the coolant and the moderator are heavy water, but they circulate in separate circuits at different temperatures. A specialised machine can replace the fuel assemblies from above without shutting down the reactor. This distinguishes Atucha from most Western pressurised water reactors.
Atucha I first achieved criticality on 13 January 1974 and supplied electricity to the grid for the first time on 19 March. The power station was inaugurated on 24 June in the presence of Argentine president Juan Domingo Perón; commercial operation also began that day. Initially it used natural uranium. In 1983, the Argentine fuel fabrication plant CONUAR at the Ezeiza research centre supplied locally manufactured fuel assemblies for Atucha I for the first time. Since 2001, the reactor has used slightly enriched uranium containing 0.85 per cent uranium-235, allowing the fuel assemblies to remain in use for longer.
In August 1988, a broken guide tube from a water-level probe damaged a fuel coolant channel, including its fuel assembly, as well as other internal components of the reactor. The unit was shut down. Argentine engineers developed special tools for inspection and repair, enabling them to reach damaged parts deep inside the pressure vessel through narrow openings. The work took approximately 17 months; Atucha I was restarted on 8 January 1990. The fuel channels were also progressively replaced in subsequent years of operation.
At the end of September 2024, the unit was taken off the grid for a comprehensive life-extension programme, including work on major plant components and safety systems. In July 2026, the operator reported that approximately 60 per cent of the work had been completed; reconnection to the grid was expected in the second half of 2027. The modernisation is intended to allow approximately another two decades of operation (as at October 2026).
- Reaktortyp
- Schwerwasser-Druckwasserreaktor
- Hersteller
- Siemens
- Betreiber
- Nucleoeléctrica Argentina S.A.
- Leistung thermisch
- 1.179 MW
- Leistung elektrisch
- 362 MW brutto, rund 335–340 MW netto
- Primärkreisläufe
- 2
- Brennstoffkanäle
- 252
- Erstkritikalität
- 13.1.1974
- Netzanschluss
- 19.3.1974
- Kommerzieller Betrieb
- ab 24.6.1974
- Status
- vorübergehend außer Betrieb
- Weiterentwicklung des MZFR
- zunächst Natururan, seit 2001 gering angereichertes Uran (0,85 % U-235)
- seit September 2024 für Lebensdauerverlängerung außer Betrieb (Stand Oktober 2026)
- Druckbehälterbauart mit senkrechten Brennstoffkanälen
Betreiber
Die staatliche Nucleoeléctrica Argentina betreibt die argentinischen Kernkraftwerke Atucha I, Atucha II und Embalse. Ihre Eigentümer sind nach Unternehmensangabe der argentinische Staat über Ministerium, CNEA und ENARSA.
- Reactor type
- Heavy-water pressurised reactor
- Manufacturer
- Siemens
- Operator
- Nucleoeléctrica Argentina S.A.
- Thermal output
- 1,179 MW
- Electrical output
- 362 MW gross, approximately 335–340 MW net
- Primary coolant loops
- 2
- Fuel channels
- 252
- First criticality
- 13 January 1974
- Grid connection
- 19 March 1974
- Commercial operation
- from 24 June 1974
- Status
- Temporarily out of operation
- Developed from the MZFR concept
- Initially natural uranium; since 2001 slightly enriched uranium (0.85% U-235)
- Out of service for life-extension work since September 2024 (as at October 2026)
- Pressure-vessel design with vertical fuel channels
Operator
State-owned Nucleoeléctrica Argentina operates Argentina's nuclear power stations Atucha I, Atucha II and Embalse. According to the company, its shareholders are the Argentine state through the ministry, CNEA and ENARSA.
Glossar:Glossary:
Schwerwasserreaktor
Kernreaktor, der schweres Wasser (D₂O) als Moderator zur Abbremsung der Neutronen verwendet. Das Kühlmittel muss dagegen nicht aus schwerem Wasser bestehen. Beim MZFR in Karlsruhe und den Atucha-Reaktoren in Argentinien diente schweres Wasser sowohl zur Moderation als auch zur Kühlung; beide sind Druckwasserreaktoren mit Reaktordruckbehälter. Niederaichbach und Lucens waren hingegen schwerwassermoderierte, mit Kohlendioxid gekühlte Druckröhrenreaktoren. Auch die kanadischen CANDU-Reaktoren besitzen Druckröhren; bei ihnen wird schweres Wasser sowohl als Moderator als auch als Kühlmittel verwendet, in getrennten Kreisläufen.
Glossar:Glossary:
Heavy-Water Reactor
A nuclear reactor that uses heavy water (D₂O) as a moderator to slow neutrons. The coolant does not, however, have to be heavy water. At the MZFR in Karlsruhe and the Atucha reactors in Argentina, heavy water served both as moderator and coolant; both are pressurised water reactors with reactor pressure vessels. Niederaichbach and Lucens, by contrast, were heavy-water-moderated, carbon-dioxide-cooled pressure-tube reactors. Canadian CANDU reactors also have pressure tubes; they use heavy water as both moderator and coolant, in separate circuits.