Berlin-Wannsee:

BER II – BERLINER EXPERIMENTIER-REAKTOR II

BER II – BERLIN EXPERIMENTAL REACTOR II

Der BER II war von 1973 bis 2019 die große Neutronenquelle des Hahn-Meitner-Instituts und späteren Helmholtz-Zentrums Berlin. Der Schwimmbadreaktor wurde 1991 auf zehn Megawatt Leistung ausgebaut und mit einer kalten Neutronenquelle ausgestattet. Internationale Forschungsteams nutzten ihn vor allem zur Untersuchung von Materialien und magnetischen Strukturen. Die Anlage befindet sich seit ihrer Abschaltung im Nachbetrieb; der Rückbau wird vorbereitet.

From 1973 to 2019, BER II was a major neutron source for the Hahn-Meitner Institute and, later, the Helmholtz-Zentrum Berlin. The swimming-pool reactor was upgraded to ten megawatts in 1991 and equipped with a cold neutron source. International research teams used it primarily to investigate materials and magnetic structures. Since shutdown, the facility has remained in the post-operational phase while dismantling is being prepared.

Der Berliner Experimentier-Reaktor II war ein offener, mit leichtem Wasser gekühlter und moderierter Schwimmbadreaktor. Er ging am 9. Dezember 1973 mit fünf Megawatt thermischer Leistung in Betrieb. Strahlrohre führten Neutronen aus dem Reaktor zu experimentellen Messplätzen. Die Erforschung der Struktur und Dynamik von Materialien entwickelte sich zur wichtigsten Aufgabe der Anlage.

Von 1985 bis 1991 wurde der Reaktor umfangreich modernisiert. Neben der Erhöhung auf zehn Megawatt erhielt er einen verkleinerten Kern, einen Berylliumreflektor und eine kalte Neutronenquelle. Stark abgebremste Neutronen gelangten über Neutronenleiter in eine eigene Experimentierhalle. Dort konnten etwa magnetische Strukturen, Bewegungen in Kristallen und Eigenschaften von Werkstoffen bei extremen Temperaturen und Magnetfeldern untersucht werden. Das Berlin Neutron Scattering Center organisierte ab 1993 die Nutzung der Messplätze durch Forschungsteams aus dem In- und Ausland.

Auch die Brennstoffgeschichte veränderte sich. Nach der Modernisierung arbeitete der BER II zunächst mit hochangereichertem Uran. Zwischen 1997 und 2000 wurde der Kern schrittweise auf niedrig angereicherten Brennstoff umgestellt; der erste vollständig damit bestückte Kern ging im Februar 2000 in Betrieb. Die Brennelemente enthielten danach Uran mit 19,75 Prozent Uran-235. Im selben Zeitraum errichtete die TU München den FRM II in Garching für Uran mit 93 Prozent Anreicherung. Auch personell waren beide Standorte verbunden: Der frühere BER-II-Umbauleiter Anton Axmann übernahm 1995 die Projektleitung des Münchner Neubaus.

Am 11. Dezember 2019 endete der Betrieb nach 46 Jahren. Ein Teil der abgebrannten Brennelemente war bis 2017 in die USA zurückgeführt worden; unbestrahlte, nicht mehr benötigte Brennelemente gingen 2021 nach Frankreich. Der Reaktorkern ist inzwischen entladen, die verbliebenen bestrahlten Brennelemente lagern jedoch weiter im Abklingbecken am Standort. Ihre Zwischenlagerung in Ahaus ist vorgesehen, ein Transport nach Angaben der BGZ nicht vor 2028. Das Genehmigungsverfahren für die Stilllegung und den Abbau des Reaktors läuft.

Berlin Experimental Reactor II was an open-pool reactor cooled and moderated by light water. It began operating on 9 December 1973 with a thermal output of five megawatts. Beam tubes carried neutrons from the reactor to experimental instruments. Research into the structure and dynamics of materials became its principal purpose.

The reactor underwent extensive modernisation between 1985 and 1991. Alongside the increase to ten megawatts, it received a smaller core, a beryllium reflector and a cold neutron source. Neutrons slowed to very low energies were transported through neutron guides to a dedicated experimental hall. Researchers there could investigate magnetic structures, movements within crystals and material properties at extreme temperatures and magnetic fields. From 1993, the Berlin Neutron Scattering Center coordinated the use of the instruments by research teams from Germany and abroad.

The reactor's fuel history also changed. Following modernisation, BER II initially operated with highly enriched uranium. Between 1997 and 2000, the core was gradually converted to low-enriched fuel; the first core loaded entirely with this fuel entered service in February 2000. Thereafter, the fuel elements contained uranium enriched to 19.75 per cent uranium-235. During the same period, the Technical University of Munich was building FRM II at Garching to use uranium enriched to 93 per cent. There was also a personnel connection between the two sites: Anton Axmann, who had led the BER II upgrade, took over project management of the new Munich reactor in 1995.

Operation ended on 11 December 2019, after 46 years. Some spent fuel elements had been returned to the United States by 2017; unirradiated fuel elements that were no longer needed were sent to France in 2021. The reactor core has since been unloaded, but the remaining irradiated fuel elements are still stored in the site's spent-fuel pool. Interim storage at Ahaus is planned; according to BGZ, transport will not take place before 2028. The licensing procedure for the reactor's decommissioning and dismantling is ongoing.

Technische EckdatenKey facts
Reaktortyp
Schwimmbadreaktor
Betreiber
Helmholtz-Zentrum Berlin für Materialien und Energie GmbH (HZB)
Leistung thermisch
5 MW, ab 1991 10 MW
Abschaltung
11.12.2019
Status
stillgelegt
Leichtwassermoderation
Inbetriebnahme 9.12.1973
kalte Neutronenquelle ab 1991
vollständige LEU-Beladung ab Februar 2000 (19,75 % U-235)
Nachbetrieb und laufendes Stilllegungs- und Abbaugenehmigungsverfahren
bestrahlte Brennelemente noch vor Ort, Ahaus vorgesehen

Betreiber

Der Forschungsreaktor BER-II wurde vom Hahn-Meitner-Institut betrieben. Anfang 2009 ging das HMI zusammen mit BESSY im Helmholtz-Zentrum Berlin auf. Das HZB führte den Reaktorbetrieb bis zur Abschaltung Ende 2019 weiter.

Technische EckdatenKey facts
Reactor type
Swimming-pool reactor
Operator
Helmholtz-Zentrum Berlin für Materialien und Energie GmbH (HZB)
Thermal output
5 MW, increased to 10 MW in 1991
Shutdown
11 December 2019
Status
shut down
Light-water moderation
Began operating on 9 December 1973
Cold neutron source from 1991
First full LEU core in February 2000 (19.75% U-235)
Post-operational phase; decommissioning and dismantling licensing procedure ongoing
Irradiated fuel elements still on site; transfer to Ahaus planned

Operator

The BER II research reactor was operated by the Hahn-Meitner Institute. In early 2009, HMI merged with BESSY to form the Helmholtz-Zentrum Berlin. HZB continued operating the reactor until its shutdown at the end of 2019.