ERLANGEN

Aus Erlangen kam ein wesentlicher Teil der deutschen Reaktortechnik: Siemens entwickelte hier seit den 1950er Jahren Reaktoren, später konstruierte die Kraftwerk Union Druckwasserreaktoren und Brennelemente. Auf dem Forschungsgelände entstanden Sicherheitsversuchsanlagen wie die PKL. Framatome führt in Erlangen Reaktorengineering, Brennstoffentwicklung und Sicherheitsleittechnik weiter.

A substantial part of Germany's reactor technology originated in Erlangen. Siemens developed reactors here from the 1950s; Kraftwerk Union subsequently designed pressurised water reactors and fuel assemblies. Safety test facilities such as the PKL were built on the research site. Framatome continues reactor engineering, fuel development and safety instrumentation and control work in Erlangen.

Anlagen am Standort:Facilities at the site:

Reaktoren aus Erlangen

Die Leitung der Siemens-Schuckertwerke kam 1945 nach Erlangen; 1949 wurde die Stadt ihr westdeutscher Firmensitz. Mitte der 1950er Jahre begann Siemens hier mit einer eigenen Reaktorentwicklung. Zunächst verfolgte das Unternehmen verschiedene Wege zur Nutzung von Natururan: Für das Kernforschungszentrum Karlsruhe entwickelte es den schwerwassergekühlten Mehrzweck-Forschungsreaktor MZFR, der 1966 in Betrieb ging. Für Niederaichbach baute Siemens einen mit Schwerwasser moderierten, aber gasgekühlten Reaktor, der nach kurzer Betriebszeit wieder stillgelegt wurde. Aus der Entwicklung schwerwassermoderierter Druckwasserreaktoren ging auch der Exportauftrag für Atucha 1 in Argentinien hervor, das 1974 erstmals kritisch wurde.

Daneben setzte Siemens auf den Leichtwasserreaktor. Obrigheim, ab 1965 errichtet und 1969 in Betrieb genommen, war der erste kommerzielle Siemens-Druckwasserreaktor in Deutschland.

1969 vereinigten Siemens und AEG ihre Kraftwerksgeschäfte in der Kraftwerk Union (KWU). Sitz der KWU AG war Mülheim an der Ruhr. In Erlangen lagen wesentliche Bereiche der Reaktorauslegung, Entwicklung und Forschung. Große Projektierungsabteilungen arbeiteten außerdem in den KWU-Hochhäusern am Kaiserlei in Offenbach, wo zeitweise rund 2.300 Menschen beschäftigt waren. In Mülheim konzentrierte sich die Turbinen- und Generatorenfertigung. Die deutschen Druckwasserreaktor-Baulinien führten Anfang der 1980er Jahre zum weitgehend standardisierten Konvoi mit drei Anlagen: Isar 2, Emsland und Neckarwestheim 2. Baubeginn war 1982; es blieben die letzten Neubauten der KWU in Deutschland.

Brennstoff, Werkstoffe und Sicherheitsversuche

Auch die Brennelemententwicklung hatte in Erlangen einen festen Platz. Seit den frühen 1970er Jahren arbeitete die KWU hier an Brennstäben, Brennelementgeometrien und Werkstoffen für Druckwasserreaktoren. Ziel waren unter anderem höhere Brennstoffabbrände und längere Einsatzzeiten. Die Brennelemente wurden in Hanau, Karlstein und später Lingen gefertigt.

Auf dem Forschungsgelände Erlangen-Süd entstanden spezialisierte Labore und Versuchseinrichtungen. Bau 34 beherbergte ein radiochemisches Labor mit Heißen Zellen, Bau 51 die Metallographie und Bau 65 Einrichtungen des Brennelementservice. Bau 52 war Standort der Kraftwerkskomponenten-Qualifizierungsanlage KOPRA und eines Keramiklabors.

Die Primärkreislauf-Versuchsanlage PKL in Bau 67 untersuchte von 1977 bis 2024 das Verhalten des Kühlsystems eines Druckwasserreaktors bei Störfällen. Die von der KWU im Großkraftwerk Mannheim errichtete UPTF ergänzte diese Forschung mit Versuchen an Reaktorkomponenten im Originalmaßstab.

Nach dem deutschen Reaktorneubau

Bereits seit 1989 entwickelten Siemens und das französische Unternehmen Framatome gemeinsam den EPR. Siemens-KWU entwickelte außerdem die softwarebasierte Sicherheitsleittechnik TELEPERM XS, die seit den 1990er Jahren in Kernkraftwerken eingesetzt wird – sowohl bei Neubauten als auch bei Nachrüstungen.

2001 brachte Siemens sein Nukleargeschäft in die Framatome ANP ein und erhielt 34 Prozent der Anteile. 2006 wurde daraus Areva NP. 2011 schied Siemens aus dem Unternehmen aus; seit 2018 trägt es wieder den Namen Framatome.

Der Umbau zum Siemens Campus veränderte auch das Forschungsgelände. Die Halle der KOPRA wurde 2022 geräumt, die PKL nach ihren letzten Versuchen 2024 demontiert. Framatome betreibt in Erlangen weiterhin Reaktorengineering, Brennelemententwicklung, Komponentenservice und Sicherheitsleittechnik. Ende 2023 beschäftigte die Framatome GmbH dort nach ihrem Jahresabschluss rund 2.200 Menschen.

Reactors from Erlangen

The management of Siemens-Schuckertwerke moved to Erlangen in 1945; the city became its West German headquarters in 1949. In the mid-1950s, Siemens began developing its own reactors here. Initially, the company explored different approaches to using natural uranium. For the Karlsruhe Nuclear Research Centre, it developed the heavy-water-cooled Multipurpose Research Reactor (MZFR), which entered service in 1966. For Niederaichbach, Siemens built a heavy-water-moderated but gas-cooled reactor that was shut down after a short period of operation. Development of heavy-water-moderated pressurised water reactors also led to the export contract for Atucha 1 in Argentina, which first achieved criticality in 1974.

At the same time, Siemens pursued light-water reactor technology. Obrigheim, built from 1965 and brought into service in 1969, was the first commercial Siemens pressurised water reactor in Germany.

In 1969, Siemens and AEG merged their power station businesses into Kraftwerk Union (KWU). KWU AG was headquartered in Mülheim an der Ruhr. Significant parts of reactor design, development and research were based in Erlangen. Large project engineering departments also worked in the KWU office towers at Kaiserlei in Offenbach, which at times employed around 2,300 people. Turbine and generator manufacturing was concentrated in Mülheim. By the early 1980s, the German pressurised water reactor design series had culminated in the largely standardised Konvoi series of three plants: Isar 2, Emsland and Neckarwestheim 2. Construction began in 1982; these remained KWU's last new nuclear power stations in Germany.

Fuel, materials and safety experiments

Nuclear fuel development also had an established presence in Erlangen. From the early 1970s, KWU worked here on fuel rods, fuel assembly geometries and materials for pressurised water reactors. Its objectives included higher fuel burnup and longer operating periods. Fuel assemblies were manufactured in Hanau, Karlstein and later Lingen.

Specialist laboratories and test facilities were developed at the Erlangen-Süd research site. Building 34 housed a radiochemistry laboratory with hot cells, Building 51 the metallography facilities and Building 65 the fuel assembly services facilities. Building 52 contained the KOPRA power plant component qualification facility and a ceramics laboratory.

The PKL primary coolant loop test facility in Building 67 investigated the behaviour of a pressurised water reactor's cooling system under accident conditions from 1977 to 2024. The UPTF, built by KWU at the Großkraftwerk Mannheim power station, complemented this research with experiments using full-scale reactor components.

After the end of new reactor construction in Germany

Siemens and the French company Framatome had already begun jointly developing the EPR in 1989. Siemens-KWU also developed the software-based TELEPERM XS safety instrumentation and control system, which has been deployed in nuclear power stations since the 1990s, both in new builds and as part of modernisation projects.

In 2001, Siemens contributed its nuclear business to Framatome ANP, receiving a 34 per cent stake. The company became Areva NP in 2006. Siemens withdrew from the business in 2011; since 2018, it has once again been called Framatome.

Redevelopment as the Siemens Campus also changed the research site. The KOPRA hall was vacated in 2022, and the PKL was dismantled after its final experiments in 2024. Framatome continues to undertake reactor engineering, fuel assembly development, component servicing and safety instrumentation and control in Erlangen. According to its annual financial statements, Framatome GmbH employed around 2,200 people there at the end of 2023.

PKL – Primärkreislauf-Versuchsanlage Erlangen

PKL – Primary Circuit Test Facility, Erlangen

Die Primärkreislauf-Versuchsanlage (PKL) wurde von Siemens/KWU in Erlangen errichtet und 1977 in Betrieb genommen. In ihr ließ sich untersuchen, was in einem Druckwasserreaktor geschieht, wenn Kühlmittel verloren geht, Pumpen ausfallen oder Notkühlsysteme unterschiedlich reagieren. Als Referenz diente zunächst ein großer KWU-Druckwasserreaktor; in der späteren Ausführung PKL III war es das Kernkraftwerk Philippsburg 2.

Die Anlage bildete den Primärkreislauf mit vier Kühlschleifen nach, jeweils mit einer Dampferzeuger-Nachbildung. Der Reaktorkern wurde durch elektrisch beheizte Stäbe ersetzt. Die Höhendifferenzen entsprachen denen eines großen Druckwasserreaktors (1:1), die Wasservolumina dagegen nur rund einem Hundertfünfundvierzigstel. So ließen sich die für Strömung und Naturumlaufkühlung wichtigen Höhenverhältnisse beibehalten.

Die Wärmeleistung des simulierten Reaktorkerns erreichte höchstens 2,5 Megawatt. Das entsprach etwa zehn Prozent der im Maßstab 1:145 verkleinerten Nennleistung des Referenzreaktors. Die Versuche konnten damit insbesondere die Wärmeabfuhr nach Abschaltung eines Reaktors abbilden, ohne dessen vollen Leistungsbetrieb nachzustellen.

Zunächst untersuchte die PKL die Wirksamkeit der Notkühlung nach größeren Rohrbrüchen. Nach dem Unfall von Three Mile Island 1979 kamen kleinere Leckagen und komplexere Störfallabläufe hinzu. Spätere Experimente betrafen unter anderem die Kühlung über die Dampferzeuger, asymmetrische Betriebsbedingungen und die Verteilung von Bor im Kühlmittel. Die Messdaten dienten zur Überprüfung von Computerprogrammen für Reaktorsicherheitsanalysen.

Seit 2001 wurde die PKL in mehreren internationalen Forschungsprojekten der OECD-NEA genutzt. Sie stand zuletzt unter Verantwortung von Framatome im Bau 67 des Erlanger Forschungsgeländes. Im Projekt ETHARINUS fanden 2024 die letzten Versuche statt; anschließend wurde die PKL demontiert.

The PKL (Primärkreislauf-Versuchsanlage) was built by Siemens/KWU in Erlangen and commissioned in 1977. It made it possible to investigate what happens inside a pressurised water reactor when coolant is lost, pumps fail or emergency cooling systems respond in different ways. The initial reference design was a large KWU pressurised water reactor; in the later PKL III configuration it was the Philippsburg 2 nuclear power plant.

The facility reproduced the primary circuit with four coolant loops, each with a simulated steam generator. Electrically heated rods took the place of the reactor core. The vertical dimensions corresponded to those of a large pressurised water reactor (1:1), while water volumes were reduced to approximately one 145th. This preserved the height relationships important for flow and natural circulation cooling.

The simulated reactor core had a maximum heat output of 2.5 megawatts. This was around ten per cent of the reference reactor's nominal power scaled down by a factor of 145. The experiments could therefore model heat removal following reactor shutdown without reproducing full-power operation.

Initially, PKL investigated the effectiveness of emergency cooling after major pipe breaks. Following the Three Mile Island accident in 1979, smaller leaks and more complex accident sequences were added to the programme. Later experiments addressed cooling via the steam generators, asymmetric operating conditions and boron distribution in the coolant, among other topics. The measurements were used to validate computer codes for reactor safety analyses.

From 2001, PKL was used in a series of international research projects under the OECD Nuclear Energy Agency (NEA). Most recently, it was operated under the responsibility of Framatome in Building 67 at the Erlangen research site. The final experiments took place in 2024 as part of the ETHARINUS project; PKL was subsequently dismantled.

Technische EckdatenKey factsThermohydraulische Versuchsanlage für Druckwasserreaktoren · Primärkreislauf mit 4 Kühlschleifen · Höhenmaßstab 1:1 · Volumenmaßstab 1:145 · elektrische Heizleistung höchstens 2,5 MW (ca. 10 % der maßstäblich verkleinerten Nennleistung) · Betrieb 1977–2024 · danach demontiert
Technische EckdatenKey factsThermal-hydraulic test facility for pressurised water reactors · Primary circuit with 4 coolant loops · Height scale 1:1 · Volume scale 1:145 · Maximum electrical heating power 2.5 MW (approximately 10% of nominal power reduced to the model scale) · Operated 1977–2024 · Subsequently dismantled