THTR-300 – THORIUM-HOCHTEMPERATURREAKTOR

THTR-300 – THORIUM HIGH-TEMPERATURE REACTOR

Der THTR-300 in Hamm-Uentrop war die großtechnische Fortsetzung des Jülicher Kugelhaufenreaktors AVR. Das vom Bund und Nordrhein-Westfalen geförderte Demonstrationskraftwerk sollte mit Heliumkühlung und Thoriumbrennstoff einen neuen Reaktorweg eröffnen. Nach vierzehn Jahren Bauzeit erzeugte es ab 1985 Strom. Technische Störungen, die umstrittene Freisetzung radioaktiver Stoffe unmittelbar nach Tschernobyl und fehlende Mittel für den Weiterbetrieb führten 1989 zur Stilllegung. Der Reaktor steht seit 1997 im sicheren Einschluss.

The THTR-300 at Hamm-Uentrop was the full-scale successor to the AVR pebble-bed reactor at Jülich. Supported by the federal government and the state of North Rhine-Westphalia, the demonstration power station was intended to open up a new approach to reactor technology using helium cooling and thorium fuel. After fourteen years of construction, it began generating electricity in 1985. Technical problems, the disputed release of radioactive material shortly after Chernobyl and a lack of funding for continued operation led to the decision to shut it down permanently in 1989. The reactor has been in safe enclosure since 1997.

Jülichs zweiter Reaktorweg

Die Forschungsanlage Jülich begann in den 1960er-Jahren, sich auf den Hochtemperaturreaktor zu konzentrieren. Der Ingenieur Rudolf Schulten hatte ein Konzept mit heliumgekühltem Reaktorkern aus kugelförmigen Graphit-Brennelementen entwickelt. Der kleine, ab 1961 gebaute AVR bei Jülich sollte dessen technische Machbarkeit demonstrieren. Als Schulten 1964 Direktor des Instituts für Reaktorentwicklung der Kernforschungsanlage Jülich wurde, erhielt die Hochtemperaturtechnik einen institutionellen Schwerpunkt. Im geplanten Thoriumkreislauf sollte der Reaktor Thorium-232 in spaltbares Uran-233 umwandeln. Der THTR war jedoch als Konverter ausgelegt: Er erzeugte weniger neuen Spaltstoff, als er verbrauchte.

Für die Demonstrationsanlage wählte man einen Standort beim Steinkohlekraftwerk Westfalen in Hamm-Uentrop. Hersteller war die Hochtemperatur-Reaktorbau GmbH (HRB), an der Brown, Boveri & Cie. und Krupp beteiligt waren. Betreiberin wurde die Hochtemperatur-Kernkraftwerk GmbH (HKG), hinter der die Vereinigten Elektrizitätswerke Westfalen (VEW) und weitere Versorger standen. Die öffentliche Hand übernahm den größten Teil des Entwicklungsrisikos. Nach Angaben der Bundesregierung entfielen von rund zwei Milliarden Euro Baukosten etwa 1,3 Milliarden auf den Bund, je 0,2 Milliarden auf Nordrhein-Westfalen und die Betreiberin HKG sowie 0,1 Milliarden auf die Hersteller; weitere rund 0,3 Milliarden wurden durch Darlehen finanziert.

Kugelbrennstoff und ein ungewöhnlicher Kühlturm

Der Baubeginn war 1971. Der THTR erhielt einen Graphitkugelhaufen mit rund 675.000 Brennelement- und Moderator-Kugeln, einen massiven Spannbeton-Reaktordruckbehälter und Helium als Kühlgas. Dieses erreichte Temperaturen von etwa 750 Grad Celsius. In den etwa sechs Zentimeter großen Brennelementkugeln befanden sich zahlreiche beschichtete Brennstoffpartikel mit Uran und Thorium. Die Kugeln sollten während des Betriebs durch den Reaktorkern geführt und schrittweise ausgetauscht werden können.

Besonders auffällig war der Trockenkühlturm nach einem Entwurf des Ingenieurs Jörg Schlaich: Ein Seilnetz trug die Aluminiumverkleidung des hyperbolischen Turms. Der obere Ring befand sich 146 Meter über dem Boden, gehalten von einem 180 Meter hohen zentralen Betonmast. Der Turm wurde 1991 gesprengt.

Die Bauzeit zog sich auf vierzehn Jahre, die Kosten stiegen von ursprünglich weniger als einer Milliarde auf rund vier Milliarden D-Mark. Der Reaktor wurde am 13. September 1983 erstmals kritisch und lieferte ab November 1985 Strom; der kommerzielle Leistungsbetrieb begann im Juni 1987. Probleme mit Kugelbruch, Abrieb und der Brennelementbeschickung belasteten den Betrieb von Anfang an.

Der 4. Mai 1986

Nur acht Tage nach dem Unfall von Tschernobyl kam es auch in Hamm zu einer Freisetzung radioaktiver Stoffe. Am 4. Mai 1986 wurde bei der Störungsbeseitigung an der Brennelementbeschickung radioaktiv belastete Abluft abgegeben. Die Betreiberinformation und die späteren Ermittlungen der Atomaufsicht wurden Gegenstand heftiger Auseinandersetzungen. Die Behörde führte die Freisetzung auf Fehlhandlungen und technische Probleme zurück und bezifferte sie als vergleichsweise gering. Die Öffentlichkeit erfuhr erst mit Verzögerung von der eigenständigen Emission aus Hamm.

Zugleich waren in Deutschland durch den Fallout aus Tschernobyl erhöhte Messwerte zu beobachten. Die zeitliche Überlagerung erschwerte die öffentliche Zuordnung radioaktiver Belastungen.

Das Ende der Förderung

Nach weiteren Problemen wurde der Reaktor am 29. September 1988 zur Revision abgeschaltet. Unter anderem fanden sich Schäden an Bauteilen der Heißgaskanäle. Für die erforderlichen Arbeiten und den Weiterbetrieb standen erhebliche zusätzliche Kosten im Raum. Nach Tschernobyl hatte sich die politische Haltung in Nordrhein-Westfalen grundlegend verändert. Die SPD-geführte Landesregierung lehnte eine weitere Mitfinanzierung ab. Ministerpräsident Johannes Rau erklärte dies dem Bundesforschungsminister im Februar 1989 ausdrücklich; die Betreibergesellschaft konnte die Finanzierung nicht aus eigener Kraft sichern.

Im September 1989 fiel die Entscheidung zur endgültigen Stilllegung. Bund, Land und die HKG-Gesellschafter vereinbarten im November die Finanzierung der Abwicklung. Die Brennelementkugeln wurden aus dem Reaktor entfernt und nach Ahaus transportiert. Seit Oktober 1997 befindet sich der THTR im sicheren Einschluss. Die langfristigen Kosten des Einschlusses und eines späteren Rückbaus beschäftigen das Land Nordrhein-Westfalen bis heute.

Jülich's alternative reactor approach

In the 1960s, the Jülich research establishment began concentrating on high-temperature reactor technology. The engineer Rudolf Schulten had developed a concept using a helium-cooled reactor core filled with spherical graphite fuel elements. The small AVR, under construction near Jülich from 1961, was intended to demonstrate its technical feasibility. When Schulten became director of the Institute for Reactor Development at the Jülich Nuclear Research Centre in 1964, high-temperature technology gained a dedicated institutional base. In the proposed thorium fuel cycle, the reactor would convert thorium-232 into fissile uranium-233. The THTR, however, was designed as a converter: it produced less new fissile material than it consumed.

A site beside the Westfalen coal-fired power station at Hamm-Uentrop was chosen for the demonstration plant. The manufacturer was Hochtemperatur-Reaktorbau GmbH (HRB), in which Brown, Boveri & Cie. and Krupp held interests. The operator was Hochtemperatur-Kernkraftwerk GmbH (HKG), backed by Vereinigte Elektrizitätswerke Westfalen (VEW) and other utilities. The public sector assumed most of the development risk. According to the German federal government, of the approximately €2 billion in construction costs, around €1.3 billion was borne by the federal government, €0.2 billion each by North Rhine-Westphalia and the operator HKG, and €0.1 billion by the manufacturers; a further €0.3 billion or so was financed through loans.

Pebble fuel and an unusual cooling tower

Construction began in 1971. The THTR had a graphite pebble bed containing around 675,000 fuel and moderator spheres, a massive prestressed-concrete reactor pressure vessel and helium as its coolant gas. The helium reached temperatures of approximately 750 degrees Celsius. The fuel spheres, roughly six centimetres in diameter, contained numerous coated fuel particles incorporating uranium and thorium. The spheres were designed to move through the reactor core and be replaced progressively while it was operating.

A particularly striking feature was the dry cooling tower designed by engineer Jörg Schlaich: a cable net supported the aluminium cladding of the hyperbolic tower. Its upper ring stood 146 metres above ground, supported by a central concrete mast 180 metres high. The tower was demolished by controlled explosion in 1991.

Construction stretched over fourteen years, with costs rising from an initial estimate of less than one billion to around four billion Deutsche Marks. The reactor first achieved criticality on 13 September 1983 and began supplying electricity in November 1985; commercial operation began in June 1987. Problems with broken pebbles, abrasion and fuel handling affected operation from the outset.

4 May 1986

Just eight days after the Chernobyl accident, radioactive material was also released at Hamm. On 4 May 1986, radioactively contaminated exhaust air was discharged during efforts to resolve a fault in the fuel-handling system. Information provided by the operator and subsequent investigations by the nuclear regulator became the subject of intense controversy. The authority attributed the release to operator errors and technical problems and assessed it as relatively small. The public only learned of the separate emission from Hamm after a delay.

At the same time, elevated radiation readings were being recorded in Germany as a result of fallout from Chernobyl. The overlap in timing made it difficult for the public to attribute radioactive contamination to a particular source.

The end of public funding

After further problems, the reactor was shut down for an inspection on 29 September 1988. Among the defects discovered was damage to components of the hot-gas ducts. The necessary repairs and continued operation would have entailed substantial additional costs. Following Chernobyl, the political position in North Rhine-Westphalia had changed fundamentally. The SPD-led state government refused to provide further co-financing. Minister-President Johannes Rau explicitly informed the federal research minister of this in February 1989; the operating company could not secure the necessary funding on its own.

The decision to close the plant permanently was taken in September 1989. In November, the federal government, the state and HKG's shareholders agreed on funding for the closure process. The fuel spheres were removed from the reactor and transported to Ahaus. The THTR has been in safe enclosure since October 1997. The long-term costs of maintaining the enclosure and eventually dismantling the reactor remain an issue for North Rhine-Westphalia.

Technische EckdatenKey facts
Reaktortyp
Heliumgekühlter Kugelhaufen-Hochtemperaturreaktor
Hersteller
Hochtemperatur-Reaktorbau GmbH (HRB)
Betreiber
Hochtemperatur-Kernkraftwerk GmbH
Leistung thermisch
760 MW
Leistung elektrisch
308 MW brutto / 296 MW netto
Baubeginn
Mai 1971
Erstkritikalität
13.9.1983
Netzanschluss
16.11.1985
Kommerzieller Betrieb
1.6.1987
Abschaltung
29.9.1988
Rückbau
Stilllegungsentscheidung September 1989; sicherer Einschluss seit Oktober 1997
Status
sicherer Einschluss
THTR-300
Entwicklungslinie: AVR Jülich / Rudolf Schulten
Hamm-Uentrop, Nordrhein-Westfalen
Technische EckdatenKey facts
Reactor type
Helium-cooled pebble-bed high-temperature reactor
Manufacturer
Hochtemperatur-Reaktorbau GmbH (HRB)
Operator
Hochtemperatur-Kernkraftwerk GmbH
Thermal output
760 MW
Electrical output
308 MW gross / 296 MW net
Construction started
May 1971
First criticality
13.9.1983
Grid connection
16.11.1985
Commercial operation
1.6.1987
Shutdown
29.9.1988
Decommissioning
Decision on permanent closure September 1989; safe enclosure since October 1997
Status
Safe enclosure
THTR-300
Development lineage: AVR Jülich / Rudolf Schulten
Hamm-Uentrop, North Rhine-Westphalia

Glossar:Glossary:

Zwei alternative Reaktorlinien

Neben den kommerziell erfolgreichen Leichtwasserreaktoren förderte die Bundesrepublik zwei alternative Reaktorkonzepte: den natriumgekühlten Schnellen Brüter aus Karlsruhe und den heliumgekühlten Thorium-Hochtemperaturreaktor aus Jülich. Ihre großen Demonstrationsanlagen entstanden in Kalkar und Hamm-Uentrop. Beide Programme wurden mit hohen staatlichen Mitteln finanziert und scheiterten als großtechnische Entwicklungslinien.

Schnelle Brüter nutzen hochenergetische Neutronen, um Uran-238 in spaltbares Plutonium umzuwandeln. Der natriumgekühlte SNR-300 in Kalkar sollte mehr Spaltstoff erzeugen, als er verbrauchte. Das Konzept setzte Wiederaufarbeitung und die erneute Herstellung von Brennelementen voraus.

Hochtemperaturreaktoren verwenden Graphit als Moderator und ein Gas, beim THTR Helium, als Kühlmittel. In Hamm-Uentrop wurden kugelförmige Brennelemente mit Uran und Thorium eingesetzt. Durch Neutroneneinfang konnte Thorium-232 in Uran-233 überführt werden. Der THTR war ein Konverter, kein Brutreaktor mit positivem Spaltstoffüberschuss.

Nach Tschernobyl 1986 verschärften sich die Auseinandersetzungen um die Fortführung der Programme. 1989 wurden der THTR und die geplante Wiederaufarbeitungsanlage Wackersdorf aufgegeben; 1991 folgte Kalkar. Damit endeten binnen drei Jahren beide alternativen Reaktorlinien und das deutsche Wiederaufarbeitungsprojekt.

Glossar:Glossary:

Two Alternative Reactor Technologies

Alongside the commercially successful light-water reactors, West Germany supported two alternative reactor concepts: the sodium-cooled fast breeder developed at Karlsruhe and the helium-cooled thorium high-temperature reactor developed at Jülich. Their large demonstration plants were built at Kalkar and Hamm-Uentrop. Both programmes received substantial public funding but failed to establish themselves as large-scale industrial technologies.

Fast breeders use high-energy neutrons to convert uranium-238 into fissile plutonium. The sodium-cooled SNR-300 at Kalkar was intended to produce more fissile material than it consumed. The concept depended on reprocessing and the subsequent manufacture of new fuel assemblies.

High-temperature reactors use graphite as a moderator and gas – helium in the case of the THTR – as a coolant. At Hamm-Uentrop, spherical fuel elements containing uranium and thorium were used. Neutron capture could convert thorium-232 into uranium-233. The THTR was a converter, not a breeder reactor producing a net surplus of fissile material.

After the Chernobyl disaster in 1986, disputes over whether to continue these programmes intensified. The THTR and the planned Wackersdorf reprocessing plant were abandoned in 1989, followed by Kalkar in 1991. Within three years, both alternative reactor development programmes and the German reprocessing project had come to an end.