Jülich:

AVR – ARBEITSGEMEINSCHAFT VERSUCHSREAKTOR

Der AVR war ein heliumgekühlter Kugelhaufen-Hochtemperaturreaktor mit etwa 15 MW elektrischer Leistung. Die Versuchsanlage entstand ab 1961 auf einem eigenen Grundstück neben der Kernforschungsanlage Jülich, erreichte 1966 die erste Kritikalität und lieferte ab 1967 Strom. Sie wurde zum technischen Vorläufer des THTR-300 in Hamm-Uentrop. Nach der Abschaltung 1988 erwies sich der Rückbau wegen umfangreicher Kontaminationen als aufwendig.

The AVR was a helium-cooled, pebble-bed high-temperature reactor with an electrical output of approximately 15 MW. Construction of the experimental facility began in 1961 on a separate site next to the Jülich Nuclear Research Centre. It first reached criticality in 1966 and began generating electricity in 1967. It became a technical precursor to the THTR-300 at Hamm-Uentrop. Following shutdown in 1988, dismantling proved difficult because of extensive radioactive contamination.

Kommunale Elektrizitätsversorger gründeten 1959 die Arbeitsgemeinschaft Versuchsreaktor GmbH, um ein Reaktorkonzept Rudolf Schultens praktisch zu erproben. Der AVR entstand unmittelbar neben dem Jülicher Forschungszentrum, zunächst als rechtlich und organisatorisch eigenständige Anlage. Helium transportierte die Reaktorwärme zu einem Dampferzeuger, Graphit moderierte die Neutronen. Der Brennstoff war in Graphitkugeln mit kleinen, mehrfach beschichteten Brennstoffpartikeln eingeschlossen. Die Kugeln konnten während des Betriebs entnommen und nachgefüllt werden. Der Reaktor hatte 46 MW thermische und rund 15 MW elektrische Leistung.

Die erste Kritikalität wurde am 26. August 1966 erreicht; am 17. Dezember 1967 begann die Stromlieferung an das öffentliche Netz. Ab Februar 1974 wurde der AVR mit einer mittleren Helium-Austrittstemperatur von 950 °C betrieben. Damit demonstrierte er eine für die geplante industrielle Prozesswärmenutzung wichtige Eigenschaft des Hochtemperaturreaktors. Seine Betriebserfahrungen flossen in die Entwicklung des größeren THTR-300 ein.

Die hohen Betriebstemperaturen führten zugleich zu erheblichen Problemen. Im Reaktorkern kam es zu örtlichen Temperaturüberhöhungen und zur Freisetzung radioaktiver Spaltprodukte in den Primärkreislauf. Bei einem Leck im Dampferzeuger drangen im Mai 1978 rund 27 Kubikmeter Wasser in den Reaktorkreislauf ein. Die Neubewertung der Betriebsgeschichte durch Rainer Moormann ab 2008 und der Abschlussbericht einer unabhängigen Expertengruppe von 2014 machten das Ausmaß der Kontaminationen und der damaligen Versäumnisse deutlich.

Nach der Abschaltung Ende 1988 wurde anstelle des zunächst geplanten sicheren Einschlusses der vollständige Rückbau beschlossen. Der mit Porenleichtbeton verfüllte Reaktorbehälter wurde im Mai 2015 mit einem Gewicht von rund 2.000 Tonnen in ein etwa 600 Meter entferntes Lagergebäude verlagert. Die Demontage der übrigen Anlage wird fortgesetzt.

In 1959, municipal electricity utilities established Arbeitsgemeinschaft Versuchsreaktor GmbH to test a reactor concept developed by Rudolf Schulten in practice. The AVR was built immediately next to the Jülich research centre, initially as a legally and organisationally independent facility. Helium carried heat from the reactor to a steam generator, while graphite moderated the neutrons. The fuel was enclosed in graphite spheres containing small, multiply coated fuel particles. These pebbles could be removed and replenished during operation. The reactor had a thermal output of 46 MW and an electrical output of approximately 15 MW.

First criticality was achieved on 26 August 1966, and electricity was first supplied to the public grid on 17 December 1967. From February 1974, the AVR operated at a mean helium outlet temperature of 950°C. This demonstrated a property of high-temperature reactors that was important for their proposed industrial process-heat applications. Experience gained from operating the AVR fed into the development of the larger THTR-300.

At the same time, the high operating temperatures caused serious problems. Localised overheating occurred in the reactor core, and radioactive fission products were released into the primary circuit. In May 1978, a leak in the steam generator allowed approximately 27 cubic metres of water to enter the reactor circuit. Rainer Moormann's reassessment of the operating history from 2008 onwards, and the final report of an independent group of experts in 2014, revealed the extent of the contamination and of the shortcomings at the time.

After shutdown at the end of 1988, a decision was taken to dismantle the facility completely rather than place it in the originally envisaged state of safe enclosure. In May 2015, the reactor vessel, filled with lightweight porous concrete and weighing approximately 2,000 tonnes, was moved to a storage building some 600 metres away. Dismantling of the remaining facility continues.

Technische EckdatenKey facts
Reaktortyp
Heliumgekühlter Kugelhaufen-Hochtemperaturreaktor
Hersteller
BBC/Krupp (Arbeitsgemeinschaft)
Betreiber
Arbeitsgemeinschaft Versuchsreaktor GmbH
Leistung thermisch
46 MW
Leistung elektrisch
ca. 15 MW
Erstkritikalität
26.8.1966
Netzanschluss
17.12.1967
Abschaltung
1988
Status
im Rückbau
Reaktorbehälter 2015 ausgelagert
Graphitmoderation
Technische EckdatenKey facts
Reactor type
Helium-cooled pebble-bed high-temperature reactor
Manufacturer
BBC/Krupp (consortium)
Operator
Arbeitsgemeinschaft Versuchsreaktor GmbH
Thermal output
46 MW
Electrical output
approx. 15 MW
First criticality
26 August 1966
Grid connection
17 December 1967
Shutdown
1988
Status
undergoing dismantling
Reactor vessel transferred to storage in 2015