SNR-300 – SCHNELLER BRÜTER KALKAR

SNR-300 – KALKAR FAST BREEDER REACTOR

Der Schnelle Brüter in Kalkar sollte aus dem weitgehend ungenutzten Uran-238 neuen Kernbrennstoff gewinnen. Aus einem staatlich geförderten Forschungsprogramm des Kernforschungszentrums Karlsruhe wurde ein deutsch-niederländisch-belgisches Großprojekt. Nach zwölf Jahren Bauzeit war die Anlage 1985 für den nichtnuklearen Probebetrieb bereit, erhielt jedoch keine Erlaubnis zur nuklearen Inbetriebnahme. 1991 wurde das rund 7,5 Milliarden D-Mark teure Projekt aufgegeben; auf dem Gelände entstand ein Freizeitpark.

The fast breeder reactor at Kalkar was intended to produce new nuclear fuel from the largely unused uranium-238 isotope. A government-funded research programme at the Karlsruhe Nuclear Research Centre developed into a major German–Dutch–Belgian project. After twelve years of construction, the plant was ready for non-nuclear trial operation in 1985, but never received permission for nuclear commissioning. In 1991, the project, which had cost around 7.5 billion Deutsche Marks, was abandoned. An amusement park subsequently opened on the site.

Karlsruhes Weg zum Brüter

Anfang der 1960er-Jahre stand das Kernforschungszentrum Karlsruhe vor einer Neuorientierung. Die Arbeit am Schwerwasser-Forschungsreaktor FR 2 war weitgehend abgeschlossen, bei den kommerziellen Kraftwerken setzten sich amerikanisch geprägte Leichtwasserreaktoren durch. Unter dem Physiker Wolf Häfele begann das Zentrum ein Entwicklungsprogramm für Schnelle Brüter, das der Bund ab 1964 großzügig förderte. Hinter dem Konzept stand die Erwartung, dass die Vorräte an leicht spaltbarem Uran-235 für einen weltweiten Ausbau der Kernenergie nicht genügen würden.

Schnelle Brüter sollten das im Natururan überwiegende Uran-238 in spaltbares Plutonium umwandeln. Dazu brauchten sie schnelle Neutronen und einen Brennstoffkreislauf mit Wiederaufarbeitung. In Karlsruhe wurden unter anderem die Schnelle Nullenergieanordnung SNEAK und die Kompakte Natriumgekühlte Kernreaktoranlage KNK errichtet; deren späterer schneller Kern KNK II erprobte das Prinzip auf kleinerem Maßstab. Die Entwicklung des größeren SNR-300 übernahm die Firma Interatom, die zur Siemens-Gruppe kam, mit Partnern aus den Niederlanden und Belgien.

Ein europäischer Prototyp am Rhein

1972 fiel die Entscheidung für den Bau bei Kalkar-Hönnepel am Niederrhein. Die Internationale Natrium-Brutreaktor-Baugesellschaft (INB) übernahm die Bauherrschaft, die Lieferung erfolgte durch ein internationales Industriekonsortium unter maßgeblicher Beteiligung von Interatom. Im April 1973 begannen die Bauarbeiten. Die Stromwirtschaft beteiligte sich, doch die öffentlichen Forschungs- und Fördermittel waren für die Durchführung des technisch und wirtschaftlich riskanten Vorhabens entscheidend.

Der SNR-300 sollte etwa 300 Megawatt elektrischer Leistung erzeugen. Anders als Wasserreaktoren verwendete er flüssiges Natrium zur Kühlung. Das Metall überträgt Wärme bei niedrigem Druck und hohen Temperaturen, reagiert aber heftig mit Wasser und kann an Luft brennen. Ein Zwischenkreislauf aus Natrium trennte deshalb den Reaktor von der Dampferzeugung. Zu den umstrittenen Sicherheitsfragen gehörte eine hypothetische rasche Leistungsexkursion des reaktivitätsreichen Kerns, der sogenannte Bethe-Tait-Störfall: Wie viel Energie könnte im äußersten Fall freigesetzt werden und welche Belastung müsste der Sicherheitsbehälter aushalten?

Die Kosten waren 1972 mit rund 1,5 Milliarden D-Mark kalkuliert worden. Neue Entwicklungsaufgaben, geänderte Auslegungen und langwierige Genehmigungen ließen sie immer weiter steigen. 1984 kam es auf dem Gelände zu einem Natriumbrand. 1985 wurde der nichtnukleare Probebetrieb durchgeführt, 1986 war die Anlage im Wesentlichen fertiggestellt – ohne dass die Brennelemente eingesetzt waren.

Die politische Entscheidung über ein technisches Risiko

Kalkar wurde zu einem der bedeutendsten Schauplätze der Anti-Atom-Bewegung. Im September 1977 demonstrierten Zehntausende Menschen, darunter viele aus den Niederlanden, gegen den Brüter. Im sogenannten Kalkar-Beschluss vom 8. August 1978 hielt das Bundesverfassungsgericht die gesetzliche Zulassung der Brütertechnologie für verfassungsgemäß. Es betonte dabei die Pflicht zur bestmöglichen Gefahrenvorsorge nach dem Stand von Wissenschaft und Technik und die Grenze jeder technischen Beherrschbarkeit: Ein verbleibendes Restrisiko sei gesellschaftlich hinzunehmen, wenn der Gesetzgeber die Technologie zulasse. Am 14. Dezember 1978 stellte der Bundestag die Inbetriebnahme unter einen politischen Vorbehalt und setzte eine Enquete-Kommission ein.

Die 1979 eingesetzte Enquete-Kommission „Zukünftige Kernenergie-Politik“ und ihre Fortsetzung untersuchten die sicherheitstechnischen und energiepolitischen Voraussetzungen. Am 24. März 1983 hob der Bundestag mit der neuen christlich-liberalen Mehrheit den parlamentarischen Inbetriebnahmevorbehalt auf. Nordrhein-Westfalens SPD-Regierung unter Johannes Rau war inzwischen auf Distanz gegangen. Wirtschaftsminister Reimut Jochimsen erteilte im Oktober 1985 die 17. Teilgenehmigung. Sie blieb die letzte; die Erlaubnisse zur Beladung und nuklearen Inbetriebnahme fehlten weiterhin.

Am 26. April 1986 explodierte der Reaktor von Tschernobyl. Die Auseinandersetzung um Kalkar verschärfte sich. Die nordrhein-westfälische Atomaufsicht verweigerte die noch erforderlichen Genehmigungen für die Beladung und nukleare Inbetriebnahme und verlangte zusätzliche Sicherheitsbewertungen. Bund und Land stritten darüber bis vor das Bundesverfassungsgericht. Im Mai 1990 bestätigte dieses die bundesaufsichtliche Weisungsbefugnis; am Betriebsbeginn änderte das nichts. Die Betreiber mussten die ungenutzte Anlage für hohe Summen betriebsbereit halten und verloren zunehmend das Interesse an ihrem Einsatz.

Siebeneinhalb Milliarden Mark und ein Freizeitpark

Am 21. März 1991 verkündete Bundesforschungsminister Heinz Riesenhuber die endgültige Einstellung des Projekts. Statt der ursprünglich veranschlagten rund 1,5 Milliarden D-Mark hatte es etwa 7,5 Milliarden gekostet. Der Reaktor blieb unbenutzt; die bereits hergestellten Brennelemente wurden später in Frankreich zu Mischoxid-Brennstoff für Leichtwasserreaktoren verarbeitet.

Der niederländische Unternehmer Hennie van der Most erwarb das Gelände und ließ es ab Mitte der 1990er-Jahre zu einem Freizeitpark umbauen, dem „Kernwasser-Wunderland“ (heute „Wunderland Kalkar“). Wasser gab es im Natrium-gekühlten Reaktor zum Glück nie. Vom früheren Kraftwerk blieben unter anderem der Kühlturm und Teile der Gebäude erhalten.

Karlsruhe's route to the breeder reactor

In the early 1960s, the Karlsruhe Nuclear Research Centre faced a change of direction. Work on the FR 2 heavy-water research reactor was largely complete, while American-derived light-water reactors were gaining ground in commercial power generation. Under physicist Wolf Häfele, the centre launched a fast breeder reactor development programme that received substantial federal support from 1964 onwards. The concept was driven by the expectation that supplies of readily fissile uranium-235 would prove insufficient for a global expansion of nuclear power.

Fast breeders were intended to convert uranium-238, the predominant isotope in natural uranium, into fissile plutonium. This required fast neutrons and a fuel cycle incorporating reprocessing. Karlsruhe built, among other facilities, the SNEAK fast zero-energy assembly and the Compact Sodium-Cooled Nuclear Reactor Facility (KNK); the latter's subsequent fast core, KNK II, tested the principle on a smaller scale. Development of the larger SNR-300 was taken over by Interatom, which became part of the Siemens group, working with partners from the Netherlands and Belgium.

A European prototype on the Lower Rhine

In 1972, the decision was made to build the plant at Kalkar-Hönnepel on the Lower Rhine. Internationale Natrium-Brutreaktor-Baugesellschaft (INB) acted as the project developer, while an international industrial consortium, with Interatom playing a major role, supplied the plant. Construction began in April 1973. Electricity utilities participated, but public research and development funding was decisive in carrying out a project that entailed substantial technical and financial risks.

The SNR-300 was designed to generate approximately 300 megawatts of electrical power. Unlike water-cooled reactors, it used liquid sodium as coolant. The metal transfers heat at low pressure and high temperatures, but reacts violently with water and can burn in air. An intermediate sodium circuit therefore separated the reactor from the steam-generating system. One controversial safety question concerned a hypothetical rapid power excursion in the core, with its substantial potential for reactivity changes – the so-called Bethe–Tait accident: how much energy might be released in an extreme case, and what load would the containment have to withstand?

In 1972, the estimated cost was around 1.5 billion Deutsche Marks. New development tasks, design changes and protracted licensing procedures drove the figure ever higher. A sodium fire occurred on the site in 1984. Non-nuclear trial operation took place in 1985; by 1986 the plant was essentially complete, but its fuel assemblies had not been loaded.

The political decision over a technical risk

Kalkar became one of the most important focal points of the anti-nuclear movement. In September 1977, tens of thousands of people, including many from the Netherlands, demonstrated against the breeder reactor. In its so-called Kalkar ruling of 8 August 1978, Germany's Federal Constitutional Court held that the statutory authorisation of breeder reactor technology was constitutional. The court emphasised the obligation to take the best possible precautions against danger in accordance with the state of science and technology, while also recognising the limits of technical control: society would have to accept a residual risk if the legislature permitted the technology. On 14 December 1978, the Bundestag made commissioning subject to a political reservation and established a parliamentary commission of inquiry.

The commission on Future Nuclear Energy Policy, established in 1979, and its successor examined the safety and energy-policy conditions for the project. On 24 March 1983, the Bundestag's new Christian Democrat–Liberal majority lifted the parliamentary reservation on commissioning. Meanwhile, North Rhine-Westphalia's Social Democratic government under Johannes Rau had distanced itself from the project. In October 1985, Economy Minister Reimut Jochimsen issued the seventeenth partial licence. It was the last: permission to load fuel and commence nuclear operation was still lacking.

On 26 April 1986, the reactor at Chernobyl exploded. The dispute over Kalkar intensified. North Rhine-Westphalia's nuclear regulator refused to issue the outstanding licences for fuel loading and nuclear commissioning and demanded further safety assessments. The federal and state governments disputed the matter before the Federal Constitutional Court. In May 1990, the court confirmed the federal government's authority to issue supervisory instructions, but this did not bring the start of operation any closer. The operators had to keep the unused plant ready for operation at enormous cost and became increasingly reluctant to put it into service.

Seven and a half billion marks and an amusement park

On 21 March 1991, Federal Research Minister Heinz Riesenhuber announced the project's definitive cancellation. Instead of the approximately 1.5 billion Deutsche Marks initially budgeted, it had cost around 7.5 billion. The reactor remained unused; the fuel assemblies already manufactured were later processed in France into mixed-oxide fuel for light-water reactors.

Dutch entrepreneur Hennie van der Most bought the site and began converting it into an amusement park in the mid-1990s, the “Kernwasser-Wunderland” (“Nuclear Water Wonderland”, now called Wunderland Kalkar). Fortunately, there was never any water in the sodium-cooled reactor. The cooling tower and parts of the former power station buildings have survived.

Technische EckdatenKey facts
Reaktortyp
Natriumgekühlter schneller Reaktor
Hersteller
INB (Interatom / Belgonucléaire / Neratoom)
Leistung elektrisch
geplante Leistung rund 300 MW
Baubeginn
April 1973
Erstkritikalität
keine
Status
nie in Betrieb
SNR-300
Forschungsgrundlage: Kernforschungszentrum Karlsruhe / SNEAK / KNK II
Bauherrin: INB
nichtnuklearer Probebetrieb 1985
keine Stromproduktion
Projektabbruch März 1991
Kalkar-Hönnepel, Nordrhein-Westfalen
Brutreaktorkonzept
Technische EckdatenKey facts
Reactor type
Sodium-cooled fast reactor
Manufacturer
INB (Interatom / Belgonucléaire / Neratoom)
Electrical output
planned output approximately 300 MW
Construction started
April 1973
First criticality
none
Status
never operated
SNR-300
Research foundations: Karlsruhe Nuclear Research Centre / SNEAK / KNK II
Developer: INB
Non-nuclear trial operation in 1985
No electricity generation
Project cancelled in March 1991
Kalkar-Hönnepel, North Rhine-Westphalia
Breeder reactor concept

Glossar:Glossary:

Schneller Brüter

Kernreaktor, der mit schnellen, nicht durch einen Moderator abgebremsten Neutronen arbeitet und so ausgelegt ist, dass er aus zunächst nicht direkt spaltbarem Material neuen Kernbrennstoff erzeugen kann. Meist wird dabei Uran-238 durch Neutroneneinfang und nachfolgende Umwandlungen in Plutonium-239 überführt.

Ein Brutreaktor soll mehr spaltbares Material erzeugen, als er verbraucht. Dadurch ließe sich der Energiegehalt des Natururans erheblich besser nutzen als in herkömmlichen Leichtwasserreaktoren. Bei vielen schnellen Reaktorentwicklungen dient flüssiges Natrium als Kühlmittel, weil es die Neutronen kaum abbremst. Nicht jeder schnelle Reaktor erreicht allerdings einen Brutgewinn.

In Deutschland wurde die Technik unter anderem mit KNK II in Karlsruhe erprobt. Der größere SNR-300 in Kalkar wurde 1985/86 weitgehend fertiggestellt und ohne Kernbrennstoff erprobt. 1991 wurde das Projekt aufgegeben, ohne dass der Reaktor jemals mit Brennstoff beladen worden war.

Zwei alternative Reaktorlinien

Neben den kommerziell erfolgreichen Leichtwasserreaktoren förderte die Bundesrepublik zwei alternative Reaktorkonzepte: den natriumgekühlten Schnellen Brüter aus Karlsruhe und den heliumgekühlten Thorium-Hochtemperaturreaktor aus Jülich. Ihre großen Demonstrationsanlagen entstanden in Kalkar und Hamm-Uentrop. Beide Programme wurden mit hohen staatlichen Mitteln finanziert und scheiterten als großtechnische Entwicklungslinien.

Schnelle Brüter nutzen hochenergetische Neutronen, um Uran-238 in spaltbares Plutonium umzuwandeln. Der natriumgekühlte SNR-300 in Kalkar sollte mehr Spaltstoff erzeugen, als er verbrauchte. Das Konzept setzte Wiederaufarbeitung und die erneute Herstellung von Brennelementen voraus.

Hochtemperaturreaktoren verwenden Graphit als Moderator und ein Gas, beim THTR Helium, als Kühlmittel. In Hamm-Uentrop wurden kugelförmige Brennelemente mit Uran und Thorium eingesetzt. Durch Neutroneneinfang konnte Thorium-232 in Uran-233 überführt werden. Der THTR war ein Konverter, kein Brutreaktor mit positivem Spaltstoffüberschuss.

Nach Tschernobyl 1986 verschärften sich die Auseinandersetzungen um die Fortführung der Programme. 1989 wurden der THTR und die geplante Wiederaufarbeitungsanlage Wackersdorf aufgegeben; 1991 folgte Kalkar. Damit endeten binnen drei Jahren beide alternativen Reaktorlinien und das deutsche Wiederaufarbeitungsprojekt.

Glossar:Glossary:

Fast Breeder Reactor

A nuclear reactor that operates with fast neutrons, which are not slowed down by a moderator, and is designed to produce new nuclear fuel from material that is not initially directly fissile. Usually, uranium-238 captures neutrons and is converted through subsequent processes into plutonium-239.

A breeder reactor is intended to produce more fissile material than it consumes. This would make it possible to exploit the energy content of natural uranium much more fully than in conventional light-water reactors. Many fast-reactor designs use liquid sodium as a coolant because it slows neutrons only very slightly. Not every fast reactor, however, achieves a net breeding gain.

In Germany, this technology was tested at KNK II in Karlsruhe, among other facilities. The larger SNR-300 at Kalkar was largely completed in 1985–86 and tested without nuclear fuel. The project was abandoned in 1991, without the reactor ever having been loaded with fuel.

Two Alternative Reactor Technologies

Alongside the commercially successful light-water reactors, West Germany supported two alternative reactor concepts: the sodium-cooled fast breeder developed at Karlsruhe and the helium-cooled thorium high-temperature reactor developed at Jülich. Their large demonstration plants were built at Kalkar and Hamm-Uentrop. Both programmes received substantial public funding but failed to establish themselves as large-scale industrial technologies.

Fast breeders use high-energy neutrons to convert uranium-238 into fissile plutonium. The sodium-cooled SNR-300 at Kalkar was intended to produce more fissile material than it consumed. The concept depended on reprocessing and the subsequent manufacture of new fuel assemblies.

High-temperature reactors use graphite as a moderator and gas – helium in the case of the THTR – as a coolant. At Hamm-Uentrop, spherical fuel elements containing uranium and thorium were used. Neutron capture could convert thorium-232 into uranium-233. The THTR was a converter, not a breeder reactor producing a net surplus of fissile material.

After the Chernobyl disaster in 1986, disputes over whether to continue these programmes intensified. The THTR and the planned Wackersdorf reprocessing plant were abandoned in 1989, followed by Kalkar in 1991. Within three years, both alternative reactor development programmes and the German reprocessing project had come to an end.