KARLSRUHE

Aus der 1956 gegründeten Reaktorstation Karlsruhe entwickelte sich eines der wichtigsten Zentren der westdeutschen Kernforschung. Auf den Forschungsreaktor FR 2 folgten ein umfangreiches Brüterprogramm, Einrichtungen zur Brennstoffuntersuchung und Wiederaufarbeitung sowie das europäische Institut für Transurane. Auch der von Siemens entwickelte Schwerwasser-Kraftwerksprototyp MZFR entstand hier. Heute gehören Forschung, Rückbau und Entsorgung zum KIT Campus Nord.

The Karlsruhe Reactor Station, founded in 1956, developed into one of West Germany's leading nuclear research centres. The FR 2 research reactor was followed by an extensive breeder reactor programme, facilities for fuel examination and reprocessing, and the European Institute for Transuranium Elements. The MZFR heavy-water power reactor prototype, developed by Siemens, was also built here. Today, research, dismantling and waste management are part of KIT Campus North.

Anlagen am Standort:Facilities at the site:

Das Kernforschungszentrum

Auf dem heutigen KIT Campus Nord im Hardtwald bei Eggenstein-Leopoldshafen entstand seit 1956 die Reaktorstation Karlsruhe, später Kernforschungszentrum Karlsruhe (KfK). Der Forschungsreaktor FR 2 stand am Anfang der eigenständigen westdeutschen Reaktorentwicklung. Unter Wolf Häfele wurde die Entwicklung schneller Brutreaktoren seit 1960 zum beherrschenden Programm. Dazu gehörten die Erprobung der Reaktorphysik und der Natriumkühlung, die Untersuchung und Herstellung von Brennstoffen sowie deren chemische Wiederaufarbeitung. Ziel dieser Arbeiten war unter anderem das Schnellbrüterkraftwerk SNR-300 in Kalkar.

Auf dem Gelände entstanden außerdem der von Siemens entwickelte Mehrzweckforschungsreaktor (MZFR), die Wiederaufarbeitungsanlage Karlsruhe (WAK) und das europäische Institut für Transurane (ITU), heute JRC Karlsruhe. Hier verbinden sich unterschiedliche Reaktorkonzepte, industrielle Entwicklungsprojekte und europäische Kernbrennstoffforschung. Ein Teil der kerntechnischen Anlagen wird weiterhin genutzt, andere stehen im sicheren Einschluss oder befinden sich im Rückbau.

Von Haigerloch zur Reaktorstation

Nach dem Zweiten Weltkrieg war die deutsche Reaktorentwicklung durch alliierte Beschränkungen unterbrochen. Mitte der 1950er Jahre planten Wissenschaftler, Industrie und öffentliche Geldgeber den Bau eines Forschungsreaktors nach eigenem Entwurf. Um den Standort konkurrierten Karlsruhe und München. Werner Heisenberg wollte die Reaktorstation mit dem damals geplanten Umzug seines Max-Planck-Instituts für Physik von Göttingen nach München verbinden. 1955 fiel die Entscheidung für Karlsruhe; das Max-Planck-Institut zog 1958 nach München.

Am 19. Juli 1956 wurde die Kernreaktor Bau- und Betriebsgesellschaft mbH gegründet. 1959 entstand daneben die Gesellschaft für Kernforschung (GfK); 1963 wurden die beiden Gesellschaften zusammengeführt. Seit 1978 firmierte die Einrichtung als Kernforschungszentrum Karlsruhe (KfK), seit 1995 als Forschungszentrum Karlsruhe – Technik und Umwelt. Das Forschungszentrum ging 2009 gemeinsam mit der Universität Karlsruhe im Karlsruher Institut für Technologie (KIT) auf.

Die Reaktorentwicklung wurde wesentlich von Karl Wirtz geprägt. Er hatte im deutschen Uranverein mit Werner Heisenberg an schwerwassermoderierten Reaktoren gearbeitet und war 1945 am letzten deutschen Reaktorversuch in Haigerloch beteiligt. Am 7. März 1961 erreichte der Karlsruher FR 2 erstmals die Kritikalität. Der deutsche Eigenbaureaktor verwendete zunächst Natururan und Schwerwasser. Nach einer Umrüstung auf leicht angereicherten Brennstoff stieg seine thermische Leistung 1966 von 12 auf 44 MW. Als Neutronenquelle diente er unter anderem der Materialforschung, der Brennstoffuntersuchung und der Erzeugung von Radionukliden.

Eine neue Aufgabe: der schnelle Brüter

Die Auslegung des FR 2 war bereits Ende der 1950er Jahre weitgehend abgeschlossen. Noch während seiner Errichtung suchte die Reaktorstation nach einem neuen langfristigen Forschungsprogramm. In der industriellen Kraftwerksentwicklung übernahmen zunehmend Unternehmen wie AEG und Siemens die Führung. Karlsruhe erwog auch Großbeschleuniger für die Grundlagenforschung und entschied sich schließlich für die Entwicklung schneller Brutreaktoren.

Im April 1960 entstand unter Wolf Häfele die Projektgruppe Schneller Brüter. Häfele hatte in den Vereinigten Staaten das Modell großer, auf gemeinsame Aufgaben ausgerichteter Forschungszentren kennengelernt. Die Karlsruher Brüterentwicklung verband Physik, Chemie, Metallurgie, Ingenieurwissenschaften und industrielle Fertigung zu einem langfristigen Großprogramm. 1964 legte das Zentrum dafür einen Entwicklungsplan über fünfzehn Jahre vor, dessen Finanzierung der Bund übernahm.

Schnelle Brüter sollten das im Natururan überwiegende Uran-238 zur Bildung neuen spaltbaren Plutoniums nutzen. Die erhoffte bessere Ausnutzung der Uranressourcen machte die Technik zu einem internationalen Forschungsschwerpunkt. Zugleich erforderte sie neue Reaktorkerne, geeignete Brennstoffe, Natriumkühlung und einen geschlossenen Brennstoffkreislauf.

Siemens und der MZFR

Parallel zum Brüterprogramm entstand in Karlsruhe der Mehrzweckforschungsreaktor (MZFR). Siemens entwickelte und errichtete den schwerwassergekühlten und -moderierten Druckbehälterreaktor mit 200 MW thermischer und etwa 57 MW elektrischer Bruttoleistung. Er erreichte 1965 die Kritikalität und lieferte ab 1966 Strom sowie Wärme für den Forschungsstandort. Den Kraftwerksbetrieb führte die Kernkraftwerk-Betriebsgesellschaft mbH.

Der MZFR erprobte eine Schwerwasser-Kraftwerkslinie, aus der sich der Entwurf für das argentinische Atucha I entwickelte. Das 1968 bei Siemens bestellte Kraftwerk ging 1974 in Betrieb. Atucha II entstand später auf Grundlage eines vergrößerten Siemens-KWU-Entwurfs und wurde nach langer Bauunterbrechung unter argentinischer Verantwortung fertiggestellt. Die Entwicklungslinie wurde damit außerhalb Deutschlands fortgeführt, während sich hierzulande Leichtwasserreaktoren durchsetzten.

Von SNEAK und KNK nach Kalkar

Die Karlsruher Versuchsanordnungen STARK, SUAK und besonders SNEAK ermöglichten Untersuchungen zur Neutronenphysik schneller Reaktoren. Mit der Kompakten Natriumgekühlten Kernreaktoranlage (KNK) folgte ein Versuchsreaktor, an dem der Betrieb mit flüssigem Natrium erprobt wurde. Von 1971 bis 1974 arbeitete die Anlage mit thermischem Kern als KNK-I. Nach einem grundlegenden Umbau ging sie 1977 als schneller Reaktor KNK-II erneut in Betrieb.

Die Erfahrungen flossen in die Entwicklung des wesentlich größeren SNR-300 in Kalkar ein. Der weitgehend fertiggestellte Brüter erhielt keine Genehmigung zur nuklearen Inbetriebnahme. 1991 wurde das Projekt eingestellt; im selben Jahr endete auch der Betrieb der KNK-II.

Plutoniumforschung und das europäische Institut für Transurane

Auf dem Gelände entstand zudem eine eigenständige europäische Forschungseinrichtung. Nach einer Vereinbarung zwischen Euratom und der Bundesrepublik wurde am 1. April 1963 der Grundstein für das Institut für Transurane (ITU) gelegt; 1964 nahmen die ersten Labore die Arbeit auf. Im Mittelpunkt standen Plutonium und weitere Actiniden, ihre chemischen und physikalischen Eigenschaften, die Entwicklung und Untersuchung von Kernbrennstoffen sowie Fragen des Strahlenschutzes und der sicheren Handhabung.

Die Arbeiten standen in engem fachlichem Zusammenhang mit der Nutzung und Wiedergewinnung von Plutonium im Kernbrennstoffkreislauf. Das heutige Joint Research Centre (JRC) Karlsruhe der Europäischen Kommission setzt die Forschung mit spezialisierten Laboratorien und Heißen Zellen fort.

Brennstoffkreislauf und Wiederaufarbeitung

Zum Brüterprogramm gehörte auch die chemische Aufarbeitung bestrahlter Brennstoffe. Aus ihnen sollten Uran und Plutonium zurückgewonnen werden, um erneut Brennelemente herstellen zu können. Die Karlsruher Heißen Zellen ermöglichten Untersuchungen bestrahlter Materialien; MILLI und PUTE dienten der Entwicklung chemischer Trenn- und Extraktionsverfahren.

Die Wiederaufarbeitungsanlage Karlsruhe (WAK) entstand als Pilotanlage unter Verantwortung der Gesellschaft für Kernforschung, die auch Eigentümerin war. Betrieben wurde sie zunächst von der Gesellschaft zur Wiederaufarbeitung von Kernbrennstoffen (GWK), einem Industriekonsortium unter Beteiligung von Hoechst, NUKEM und Gelsenberg. Später übernahm die von Energieversorgungsunternehmen getragene DWK die Betreiberorganisation. Von 1971 bis 1990 wurden in Karlsruhe rund 207 Tonnen bestrahlte Kernbrennstoffe aufgearbeitet.

Die bei der Wiederaufarbeitung gewonnenen Erfahrungen sollten auch dem Ausbau des deutschen Brennstoffkreislaufs dienen. Eine große kommerzielle Anlage war schließlich in Wackersdorf geplant; das Vorhaben wurde 1989 aufgegeben. Deutsche Kernkraftwerksbetreiber ließen Brennelemente außerdem in La Hague und Sellafield aufarbeiten. Seit dem 1. Juli 2005 ist die Abgabe abgebrannter Brennelemente aus kommerziellen Kernkraftwerken an Wiederaufarbeitungsanlagen nach dem Atomgesetz unzulässig.

Stilllegung, Rückbau und neue Aufgaben

Mit der Einstellung der großen Reaktorentwicklungsprogramme rückten Stilllegung und Entsorgung in den Vordergrund. Der FR 2 wurde 1981 abgeschaltet und befindet sich im sicheren Einschluss. Der MZFR ist seit seiner Abschaltung 1984 im Rückbau; sein Reaktordruckbehälter wurde bereits zerlegt. Auch KNK und WAK werden schrittweise zurückgebaut.

Eine besondere Aufgabe bildeten die hochradioaktiven flüssigen Rückstände aus der WAK. Die Verglasungseinrichtung Karlsruhe (VEK) band sie 2009 und 2010 in eine feste Glasmatrix ein. Die 140 Glaskokillen wurden 2011 in fünf CASTOR-Behältern ins Zwischenlager Nord bei Lubmin transportiert. Weitere Anlagen am Campus behandeln und lagern schwach- und mittelradioaktive Abfälle.

Neben den kerntechnischen Altanlagen bestehen weiterhin Forschungs- und Laboreinrichtungen. Ein Teil der Heißen Zellen des früheren Forschungszentrums wird noch genutzt. Die Arbeiten des europäischen JRC dauern an; das Tritiumlabor Karlsruhe und das Fusionsmateriallabor gehören zur heutigen Forschung über Tritiumkreisläufe und Werkstoffe für Kernfusionsanlagen.

The Nuclear Research Centre

The Karlsruhe Reactor Station, later the Karlsruhe Nuclear Research Centre (KfK), was established from 1956 onwards in the Hardt Forest near Eggenstein-Leopoldshafen, on what is now KIT Campus North. The FR 2 research reactor marked the beginning of independent West German reactor development. Under Wolf Häfele, fast breeder reactor development became the dominant programme from 1960 onwards. It encompassed experiments in reactor physics and sodium cooling, the examination and fabrication of fuels, and their chemical reprocessing. One objective of this work was the SNR-300 fast breeder power station at Kalkar.

The site also housed the Mehrzweckforschungsreaktor (MZFR; Multipurpose Research Reactor) developed by Siemens, the Karlsruhe Reprocessing Plant (WAK) and the European Institute for Transuranium Elements (ITU), now JRC Karlsruhe. Different reactor concepts, industrial development projects and European nuclear fuel research came together here. Some of the nuclear facilities remain in use, while others are in safe enclosure or undergoing dismantling.

From Haigerloch to the Reactor Station

After the Second World War, German reactor development had been interrupted by Allied restrictions. In the mid-1950s, scientists, industry and public funding bodies planned to build a research reactor to a German design. Karlsruhe and Munich competed to host it. Werner Heisenberg wanted to link the reactor station to the planned move of his Max Planck Institute for Physics from Göttingen to Munich. The decision in favour of Karlsruhe was made in 1955; the Max Planck Institute moved to Munich in 1958.

The Kernreaktor Bau- und Betriebsgesellschaft mbH (Nuclear Reactor Construction and Operating Company) was founded on 19 July 1956. The Gesellschaft für Kernforschung (GfK) was established alongside it in 1959; the two companies merged in 1963. From 1978 the establishment operated as Kernforschungszentrum Karlsruhe (KfK), and from 1995 as Forschungszentrum Karlsruhe – Technik und Umwelt. In 2009, the research centre merged with the University of Karlsruhe to form the Karlsruhe Institute of Technology (KIT).

Reactor development was substantially shaped by Karl Wirtz. He had worked with Werner Heisenberg on heavy-water-moderated reactors in the German wartime uranium project and had been involved in the last German reactor experiment at Haigerloch in 1945. Karlsruhe's FR 2 first achieved criticality on 7 March 1961. This German-designed and -built reactor initially used natural uranium and heavy water. After conversion to slightly enriched fuel, its thermal output increased from 12 to 44 MW in 1966. As a neutron source, it was used for materials research, fuel examination and radionuclide production, among other purposes.

A new mission: the fast breeder reactor

The FR 2 design was largely complete by the end of the 1950s. Even while it was being built, the Reactor Station was searching for a new long-term research programme. Companies such as AEG and Siemens were increasingly taking the lead in industrial power reactor development. Karlsruhe also considered large accelerators for fundamental research before ultimately opting to develop fast breeder reactors.

In April 1960, the Fast Breeder Project Group was established under Wolf Häfele. In the United States, Häfele had encountered the model of large research centres organised around shared objectives. Karlsruhe's breeder programme brought together physics, chemistry, metallurgy, engineering and industrial manufacture in a long-term major research project. In 1964 the centre presented a fifteen-year development plan, for which the federal government assumed responsibility for funding.

Fast breeder reactors were intended to make use of uranium-238, the predominant isotope in natural uranium, to produce new fissile plutonium. The prospect of using uranium resources more efficiently made the technology an international research priority. At the same time, it required new reactor cores, suitable fuels, sodium cooling and a closed fuel cycle.

Siemens and the MZFR

Alongside the breeder programme, the Mehrzweckforschungsreaktor (MZFR) was built at Karlsruhe. Siemens designed and constructed this heavy-water-cooled and heavy-water-moderated pressure vessel reactor, with 200 MW thermal output and approximately 57 MW gross electrical output. It achieved criticality in 1965 and supplied electricity and heat to the research site from 1966. The Kernkraftwerk-Betriebsgesellschaft mbH was responsible for operating the power station.

The MZFR tested a heavy-water power reactor design from which the concept for Argentina's Atucha I emerged. The power station ordered from Siemens in 1968 entered service in 1974. Atucha II was subsequently constructed on the basis of an enlarged Siemens-KWU design and, after a lengthy interruption to construction, completed under Argentine responsibility. The technology therefore continued to be developed outside Germany, while light-water reactors became established within the country.

From SNEAK and KNK to Kalkar

Karlsruhe's experimental assemblies STARK, SUAK and especially SNEAK made it possible to investigate the neutron physics of fast reactors. They were followed by the Kompakte Natriumgekühlte Kernreaktoranlage (KNK; Compact Sodium-Cooled Nuclear Reactor Facility), an experimental reactor used to test operation with liquid sodium. From 1971 to 1974 the facility operated with a thermal core as KNK-I. Following extensive conversion, it resumed operation as the fast reactor KNK-II in 1977.

The experience gained fed into the development of the substantially larger SNR-300 at Kalkar. Although largely completed, the breeder reactor never received authorisation for nuclear commissioning. The project was abandoned in 1991; KNK-II also ceased operation that year.

Plutonium research and the European Institute for Transuranium Elements

A separate European research establishment was also created on the site. Following an agreement between Euratom and the Federal Republic of Germany, the foundation stone for the Institute for Transuranium Elements (ITU) was laid on 1 April 1963; the first laboratories began work in 1964. The institute concentrated on plutonium and other actinides, their chemical and physical properties, nuclear fuel development and examination, as well as radiation protection and safe handling.

This work was closely related to the use and recovery of plutonium in the nuclear fuel cycle. The European Commission's present-day Joint Research Centre (JRC) Karlsruhe continues the research in specialist laboratories and hot cells.

The fuel cycle and reprocessing

The breeder programme also included the chemical processing of irradiated fuels. Uranium and plutonium were to be recovered from them for use in new fuel elements. Karlsruhe's hot cells enabled irradiated materials to be examined; MILLI and PUTE served to develop chemical separation and extraction methods.

The Karlsruhe Reprocessing Plant (WAK) was built as a pilot plant under the responsibility of the Gesellschaft für Kernforschung, which also owned it. It was initially operated by the Gesellschaft zur Wiederaufarbeitung von Kernbrennstoffen (GWK), an industrial consortium involving Hoechst, NUKEM and Gelsenberg. The operator organisation was later taken over by DWK, a company backed by electricity utilities. From 1971 to 1990, approximately 207 tonnes of irradiated nuclear fuel were reprocessed at Karlsruhe.

The experience gained in reprocessing was also intended to support the expansion of Germany's nuclear fuel cycle. A large commercial plant was ultimately planned at Wackersdorf, but the project was abandoned in 1989. German nuclear power station operators also had fuel elements reprocessed at La Hague and Sellafield. Under Germany's Atomic Energy Act, the delivery of spent fuel from commercial nuclear power stations to reprocessing plants has been prohibited since 1 July 2005.

Decommissioning, dismantling and new roles

As the major reactor development programmes came to an end, decommissioning and waste management moved to the fore. FR 2 was shut down in 1981 and remains in safe enclosure. MZFR has been undergoing dismantling since its shutdown in 1984; its reactor pressure vessel has already been dismantled. KNK and WAK are also being dismantled in stages.

The high-level liquid radioactive residues from WAK presented a particular challenge. In 2009 and 2010, the Karlsruhe Vitrification Facility (VEK) incorporated them into a solid glass matrix. In 2011 the 140 vitrified waste canisters were transported in five CASTOR casks to the Interim Storage Facility North near Lubmin. Other facilities on the campus treat and store low- and intermediate-level radioactive waste.

Research and laboratory facilities continue to operate alongside the legacy nuclear installations. Some of the former research centre's hot cells remain in use. The European JRC continues its work; the Karlsruhe Tritium Laboratory and Fusion Materials Laboratory form part of current research into tritium cycles and materials for nuclear fusion facilities.

Am Standort:At the site:

KTE-Zwischenlager Karlsruhe
Lagerfunktion
Lagergebäude für schwach- und mittelradioaktive Abfälle
Betreiber
KTE
Gesamtlagerkapazität
ca. 100.000 m³gesamter Lagerkomplex, nicht die einzelnen Hallen; Stand 2025
Bereitstellungshalle L567
in Betrieb seit 2023
Zwischenlager L566
in Betrieb genommen 5.5.2025

Am Standort:At the site:

KTE Karlsruhe interim storage facility
Storage function
Storage buildings for low- and intermediate-level radioactive waste
Operator
KTE
Total storage capacity
approx. 100,000 m³entire storage complex, not individual buildings; as at 2025
Staging building L567
operational since 2023
Interim storage building L566
commissioned on 5 May 2025