KERNKRAFTWERK LINGEN
LINGEN NUCLEAR POWER PLANT
Der von der AEG entwickelte Siedewasserreaktor Lingen wurde mit einem ölbefeuerten Dampfüberhitzer kombiniert, um eine konventionelle Heißdampfturbine einsetzen zu können. Die Anlage ging 1968 mit nominell 240 Megawatt elektrischer Nettoleistung in Betrieb. Wiederkehrende Schäden an Dampfumformern und hohe Nachrüstkosten führten 1977 zur Abschaltung und 1979 zur endgültigen Aufgabe.
The Lingen boiling water reactor, developed by AEG, was combined with an oil-fired steam superheater so that a conventional superheated-steam turbine could be used. The plant entered service in 1968 with a nominal net electrical output of 240 megawatts. Recurrent damage to steam converters and the high cost of upgrading led to shutdown in 1977 and permanent abandonment of operations in 1979.
Standortgeschichte
Das Kernkraftwerk Lingen entstand am Dortmund-Ems-Kanal im Ortsteil Darme. Die Vereinigten Elektrizitätswerke Westfalen (VEW) wählten einen Standort, der zunächst für ein konventionelles Kraftwerk vorgesehen war. Für den Bau in Niedersachsen setzte sich die VEW gegen Bestrebungen durch, das Vorhaben in Westfalen anzusiedeln. Schon in der Genehmigungsphase gab es lokale Einwände wegen der Einleitung erwärmten Kühlwassers und der Emissionen der vorgesehenen Ölheizung.
Die Anlage gehört heute zum Rückbaukomplex von RWE. Ihr großer Schornstein und das Maschinenhaus sind beseitigt, der Reaktorbereich wird weiter abgebaut. In der Nachbarschaft liegen das spätere Kernkraftwerk Emsland und das Gaskraftwerk Emsland. Die Brennelementefabrik wird als eigener Standort behandelt.
Das KWL
1964 gründeten die VEW und die AEG die Kernkraftwerk Lingen GmbH. Die AEG errichtete den Reaktor weitgehend nach eigener Konstruktion. Der Siedewasserreaktor erzeugte zunächst Sattdampf. Über Dampfumformer wurde die Wärme an einen getrennten Kreislauf übertragen, dessen Dampf anschließend in einem ölbefeuerten Überhitzer auf höhere Temperaturen gebracht wurde. So ließ sich eine aus konventionellen Kraftwerken bekannte Heißdampfturbine verwenden. Die Ölheizung lieferte einen Teil der Gesamtleistung des Kraftwerks. Der Bau wurde durch Bundesmittel, Kredite und eine staatliche Absicherung von Betriebsrisiken unterstützt.
Der Reaktor erreichte am 31. Januar 1968 erstmals die Kritikalität und wurde am 1. Juli 1968 mit dem Netz verbunden. In den folgenden Jahren traten wiederholt Schäden an Brennelementen und Dampfumformern auf. Besonders undichte Schweißnähte der Dampfumformer erforderten längere Stillstände. Am 5. Januar 1977 wurde die Anlage erneut abgeschaltet. Die vorgesehenen Reparaturen und Nachrüstungen waren nach Einschätzung des Betreibers wirtschaftlich nicht mehr gerechtfertigt; 1979 fiel die Entscheidung zur endgültigen Stilllegung.
Die Brennelemente waren bis 1986 entfernt und zur Wiederaufarbeitung nach Sellafield gebracht. Ab 1989 wurden auf dem Gelände des stillgelegten Kraftwerks außerdem rund 5.000 Tonnen nach Tschernobyl radioaktiv belastetes Molkepulver aus Bayern mittels Ionenaustausch behandelt. Das 1990 abgeschlossene Vorhaben hatte in Lingen erhebliche Proteste ausgelöst. Nach einer langen Phase des sicheren Einschlusses begann 2015 der genehmigte Abbau. Die Demontage der aktivierten Großkomponenten wurde 2021 genehmigt. Nach Betreiberplanung soll der Rückbau bis Mitte der 2030er Jahre abgeschlossen sein.
History of the Site
Lingen nuclear power station was built on the Dortmund–Ems Canal in the district of Darme. Vereinigte Elektrizitätswerke Westfalen (VEW) chose a site that had originally been earmarked for a conventional power station. VEW prevailed in its choice of a site in Lower Saxony over efforts to locate the project in Westphalia. During the licensing process, local objections were already being raised over the discharge of heated cooling water and emissions from the planned oil-fired system.
The plant now forms part of RWE's decommissioning programme. Its tall chimney and turbine hall have been demolished, while dismantling of the reactor area continues. The later Emsland nuclear power station and the Emsland gas-fired power station stand nearby. The fuel fabrication plant is covered as a separate site.
The KWL
In 1964, VEW and AEG established Kernkraftwerk Lingen GmbH. AEG built the reactor largely to its own design. The boiling water reactor initially generated saturated steam. Steam converters transferred the heat to a separate circuit, whose steam was then heated to higher temperatures in an oil-fired superheater. This made it possible to use a superheated-steam turbine of the type familiar from conventional power stations. Oil firing contributed part of the plant’s total output. Construction was supported through federal funds, loans and state-backed cover for operational risks.
The reactor first achieved criticality on 31 January 1968 and was connected to the grid on 1 July. In subsequent years, fuel assemblies and steam converters repeatedly suffered damage. Leaking welds in the steam converters, in particular, necessitated lengthy shutdowns. The plant was shut down again on 5 January 1977. In the operator’s assessment, the intended repairs and upgrades were no longer economically justified; the decision to shut down permanently was taken in 1979.
By 1986, the fuel assemblies had been removed and sent to Sellafield for reprocessing. From 1989, approximately 5,000 tonnes of whey powder from Bavaria, contaminated with radioactivity following Chernobyl, were also treated by ion exchange on the disused power station site. The project, completed in 1990, had triggered substantial protests in Lingen. After a lengthy period of safe enclosure, licensed dismantling began in 2015. Dismantling of the activated major components was authorised in 2021. According to the operator’s plans, dismantling is expected to be completed by the mid-2030s.
- Reaktortyp
- Siedewasserreaktor
- Bauart / Modell
- Erste deutsche SWR-Generation
- Hersteller
- AEG
- Betreiber
- Kernkraftwerk Lingen GmbH
- Leistung thermisch
- 520 MW
- Leistung elektrisch
- 252 MW brutto / 240 MW netto (Gesamtanlage einschließlich fossiler Überhitzung)
- Erstkritikalität
- 31.1.1968
- Netzanschluss
- 1.7.1968
- Abschaltung
- 5.1.1977
- Rückbau
- Stilllegungsentscheidung 1979; Rückbau seit 2015
- Status
- im Rückbau
- Getrennter Dampfkreislauf
- Zusätzliche ölbefeuerte Dampfüberhitzung
- Reactor type
- Boiling water reactor
- Design / model
- First German BWR generation
- Manufacturer
- AEG
- Operator
- Kernkraftwerk Lingen GmbH
- Thermal output
- 520 MW
- Electrical output
- 252 MW gross / 240 MW net (entire plant, including fossil-fuel superheating)
- First criticality
- 31 January 1968
- Grid connection
- 1 July 1968
- Shutdown
- 5 January 1977
- Dismantling
- Permanent shutdown decision in 1979; dismantling since 2015
- Status
- Under dismantling
- Separate steam circuit
- Additional oil-fired steam superheating
Glossar:Glossary:
Siedewasserreaktor (SWR)
Leichtwasserreaktor, in dem das Kühlwasser bei einem Druck von etwa 70 bar im Reaktorkern selbst siedet. Der entstehende Dampf wird nach der Abscheidung von Wassertröpfchen direkt zur Turbine geleitet. Anders als beim Druckwasserreaktor gibt es keinen getrennten Dampfkreislauf mit Dampferzeugern. Das Wasser dient zugleich als Kühlmittel und Moderator.
Da der Dampf unmittelbar aus dem Reaktor stammt, wird auch das Maschinenhaus in den Strahlenschutz einbezogen. Die Steuerstäbe werden von unten in den Reaktorkern eingefahren.
Die Siedewasserreaktortechnik wurde maßgeblich von General Electric in den USA entwickelt. In der Bundesrepublik baute die AEG auf Grundlage einer GE-Lizenz das Versuchsatomkraftwerk Kahl und später unter anderem Gundremmingen A, Lingen und Würgassen. Unter dem Dach der Kraftwerk Union (KWU), in der AEG und Siemens ab 1969 ihre Kraftwerksgeschäfte zusammenführten, entwickelten sich daraus die Baulinien 69 (unter anderem Brunsbüttel, Isar 1, Philippsburg 1, Krümmel und Zwentendorf) und 72 (Gundremmingen B und C).
Glossar:Glossary:
Boiling Water Reactor (BWR)
A light-water reactor in which the cooling water boils inside the reactor core at a pressure of approximately 70 bar. After water droplets have been separated out, the resulting steam passes directly to the turbine. Unlike a pressurised water reactor, it has no separate steam circuit with steam generators. The water serves as both coolant and moderator.
Because the steam comes directly from the reactor, radiation protection requirements also extend to the turbine building. Control rods are inserted into the reactor core from below.
Boiling water reactor technology was developed principally by General Electric in the United States. In West Germany, AEG built the Kahl experimental nuclear power station under a GE licence and later built Gundremmingen A, Lingen and Würgassen, among others. Within Kraftwerk Union (KWU), into which AEG and Siemens merged their power station businesses from 1969, this led to Design Generations 69 (including Brunsbüttel, Isar 1, Philippsburg 1, Krümmel and Zwentendorf) and 72 (Gundremmingen B and C).