LA HAGUE
Seit 1966 werden auf der Halbinsel Cotentin abgebrannte Kernbrennstoffe wiederaufgearbeitet. La Hague entwickelte sich von einer Anlage für die erste französische Reaktorgeneration zu einem der größten internationalen Zentren der Wiederaufarbeitung. Seit den 1970er-Jahren kamen auch große Mengen Brennstoff aus deutschen Kernkraftwerken dorthin. Deutsche Versorger finanzierten den Ausbau der Anlage UP3-A mit. Während die ältesten Einrichtungen rückgebaut werden, arbeiten UP3-A und UP2-800 weiter.
Spent nuclear fuel has been reprocessed on the Cotentin Peninsula since 1966. La Hague developed from a facility serving France's first generation of reactors into one of the world's largest international reprocessing centres. Large quantities of fuel from German nuclear power stations have also been sent there since the 1970s. German utilities helped finance the construction of the UP3-A plant. While the oldest facilities are being dismantled, UP3-A and UP2-800 remain in operation.
Auf der Halbinsel Cotentin
Das Werk liegt nahe der Nordwestspitze der französischen Halbinsel Cotentin, wenige Kilometer vom Ärmelkanal und den Kanalinseln entfernt. La Hague ist ein über Jahrzehnte gewachsener Komplex aus Lagerbecken, Prozessgebäuden, Werkstätten, Abfallbehandlungsanlagen und Verkehrsanschlüssen.
Frankreich verfügte seit den 1950er Jahren in Marcoule über eine Anlage zur Plutoniumabtrennung aus bestrahltem Brennstoff. Dort war die Technologie zunächst im Zusammenhang mit dem französischen Kernwaffenprogramm entwickelt worden. La Hague entstand für den Brennstoff der ersten französischen gasgekühlten, graphitmoderierten Reaktoren. Der industrielle Betrieb der ursprünglichen Anlage UP2 begann 1966. Aus ihr entwickelte sich einer der größten Wiederaufarbeitungskomplexe Europas.
Von Gasgraphitreaktoren zu Leichtwasserreaktoren
Die frühen französischen Reaktoren des Typs UNGG verwendeten Natururan und Kohlendioxid als Kühlgas. Ihr metallischer Brennstoff unterschied sich erheblich von den keramischen Uranoxid-Brennelementen der später dominierenden Leichtwasserreaktoren. Als Frankreich in den 1970er Jahren auf Druckwasserreaktoren umschwenkte, musste auch La Hague umgerüstet und erweitert werden.
1976 begann in der ersten Anlage – inzwischen UP2-400 genannt – mit der Erweiterung HAO die Verarbeitung von Brennstoff aus Leichtwasserreaktoren. 1978 ging der Betrieb des Standorts von der staatlichen Forschungsorganisation CEA auf COGEMA über. Für die zunehmenden Mengen abgebrannten Brennstoffs wurden zwei neue Großanlagen errichtet: UP3-A nahm die Wiederaufarbeitung um 1990 auf, UP2-800 folgte 1994. Beide arbeiteten nach dem PUREX-Grundprinzip, mit einer auf zahlreiche abgeschirmte Prozesszellen verteilten Anlagentechnik.
Die französische Aufsicht genehmigte für die beiden jüngeren Werke zusammen höchstens 1.700 Tonnen Kernbrennstoff pro Jahr. 2024 wurden nach Angaben des Betreibers tatsächlich 871 Tonnen verarbeitet. Heute führt Orano, Nachfolger von COGEMA und Areva, den Betrieb. Die frühere UP2-400 wurde zum 1. Januar 2004 endgültig stillgelegt; ihre Altanlagen und Abfalllager befinden sich im Rückbau.
Mit dem Geld der Kunden gebaut
Die neue Anlage UP3-A war für Brennelemente ausländischer Kunden vorgesehen. Bereits 1977 vereinbarte COGEMA mit der Kraftwerksgesellschaft Philippsburg die Wiederaufarbeitung von 150 Tonnen bestrahltem Brennstoff. Ende der 1970er Jahre verfügte COGEMA über umfangreiche Verträge mit deutschen, japanischen, schwedischen, Schweizer und weiteren Energieversorgern. Ihre Vorauszahlungen finanzierten den Bau von UP3-A weitgehend vor; UP2-800 sollte vor allem den französischen Bedarf decken. Die deutsche Elektrizitätswirtschaft trug damit bereits zum Ausbau der französischen Wiederaufarbeitung bei, während sie zugleich eine eigene Großanlage plante.
Die Verträge erfüllten in der Bundesrepublik auch eine Funktion als Entsorgungsvorsorgenachweis für die Kernkraftwerke. Als der Bau in Wackersdorf scheiterte, wurde die französische Lösung noch wichtiger. Am 3. April 1989 unterzeichneten VEBA und COGEMA eine Absichtserklärung über eine vertiefte Zusammenarbeit; am 6. Juni 1989 folgte eine Vereinbarung der zuständigen deutschen und französischen Minister. Die deutschen Kraftwerksbetreiber konnten damit auf eine eigene industrielle Wiederaufarbeitung verzichten.
Deutscher Brennstoff, Plutonium und Abfälle
Zwischen 1973 und 2005 wurden nach Angaben des Bundesumweltministeriums 5.359 Tonnen abgebrannter Brennelemente aus deutschen Kernkraftwerken nach La Hague gebracht. Das bei der Wiederaufarbeitung abgetrennte Plutonium wurde unter anderem zu MOX-Brennelementen verarbeitet und in deutschen Reaktoren wieder eingesetzt. Die Herstellung erfolgte zunächst auch in Hanau, nach dem Ende der dortigen Fertigung in Werken im Ausland, darunter Dessel in Belgien und Anlagen in Frankreich.
Daneben entstanden hochradioaktive Spaltproduktlösungen und weitere kontaminierte Reststoffe. Die Flüssigabfälle wurden in Glas eingeschmolzen und in Behältern verfestigt; metallische Hüllrohrstücke und Strukturteile der Brennelemente wurden verdichtet und verpackt. Die Verträge sahen die Rückführung der dem deutschen Brennstoff zugeordneten Abfälle vor.
Der erste Transport mit verglasten Wiederaufarbeitungsabfällen aus La Hague erreichte Gorleben im Mai 1996. Bis zum letzten Transport im November 2011 wurden die CASTOR-Züge durch umfangreiche Polizeieinsätze begleitet und waren immer wieder Gegenstand großer Proteste. Die später noch ausstehenden Abfälle wurden auf Zwischenlager an früheren Kraftwerksstandorten verteilt. Am 20. November 2024 erreichten die letzten vier Behälter aus La Hague das Zwischenlager Philippsburg. Die gesamte Rückführung deutscher hochradioaktiver Wiederaufarbeitungsabfälle aus Frankreich und Großbritannien endete im Juni 2026 mit einem Transport aus Sellafield.
Was eine Wiederaufarbeitungsanlage hinterlässt
Auf La Hague fallen auch bei laufendem Betrieb hochradioaktive verglaste Abfälle, verdichtete Hüllrohrstücke, kontaminierte Anlagenmaterialien und weitere Abfallarten an. Das Werk gibt im Rahmen behördlich festgesetzter Grenzwerte radioaktive Stoffe über Luft und Wasser ab. Besonders die Einleitungen ins Meer sind seit Jahrzehnten umstritten und Gegenstand behördlicher Messungen und Kontrollen.
Die lange Betriebsgeschichte zeigt sich in den ältesten Gebäuden. In der früheren UP2-400 und ihren Nebenanlagen lagern teilweise Abfälle, die zur Zeit ihrer Entstehung noch nicht in der heute vorgesehenen Form konditioniert wurden. Ihre Bergung und Aufbereitung ist technisch schwierig. Die französische Aufsicht verweist zudem auf den Brand im Silo 130 von 1981, bei dem es zu Kontaminationen kam. Für den Rückbau mehrerer alter Einrichtungen haben sich die Zeitpläne bis in die 2040er Jahre verschoben. In den jüngeren Werken wird weiter Brennstoff wiederaufgearbeitet, während ein anderer Teil des Geländes bereits seit Jahren rückgebaut wird.
On the Cotentin Peninsula
The plant stands near the north-western tip of France's Cotentin Peninsula, a few kilometres from the English Channel and the Channel Islands. La Hague is a complex that has grown over decades, comprising storage pools, processing buildings, workshops, waste treatment facilities and transport infrastructure.
Since the 1950s, France had operated a facility at Marcoule for separating plutonium from irradiated fuel. The technology was initially developed there in connection with the French nuclear weapons programme. La Hague was built to process fuel from France's first gas-cooled, graphite-moderated reactors. Industrial operation of the original UP2 plant began in 1966. It subsequently developed into one of Europe's largest reprocessing complexes.
From gas-graphite reactors to light-water reactors
The early French UNGG reactors used natural uranium and carbon dioxide as the coolant. Their metallic fuel differed considerably from the ceramic uranium oxide fuel assemblies of the light-water reactors that later became dominant. When France switched to pressurised water reactors in the 1970s, La Hague also had to be modified and expanded.
In 1976, the HAO extension of the original plant, by then known as UP2-400, began processing fuel from light-water reactors. In 1978, responsibility for operating the site passed from the state research organisation CEA to COGEMA. Two large new plants were built to handle growing quantities of spent fuel: UP3-A began reprocessing around 1990, followed by UP2-800 in 1994. Both used the basic PUREX process, with their equipment distributed across numerous shielded processing cells.
The French regulator authorised the two newer plants to process a combined maximum of 1,700 tonnes of nuclear fuel per year. According to the operator, 871 tonnes were actually processed in 2024. Today, the site is operated by Orano, successor to COGEMA and Areva. The former UP2-400 plant was permanently shut down on 1 January 2004; its older facilities and waste stores are being dismantled.
Built with customers' money
The new UP3-A plant was intended to process fuel assemblies for foreign customers. As early as 1977, COGEMA agreed with the Philippsburg power company to reprocess 150 tonnes of irradiated fuel. By the late 1970s, COGEMA held extensive contracts with German, Japanese, Swedish, Swiss and other electricity utilities. Their advance payments largely financed construction of UP3-A; UP2-800 was intended primarily to meet French demand. The German electricity industry was thus already contributing to the expansion of French reprocessing while simultaneously planning a large plant of its own.
In West Germany, the contracts also served as evidence of arrangements for spent-fuel management required for nuclear power stations. When construction of the plant at Wackersdorf failed, the French option became still more important. On 3 April 1989, VEBA and COGEMA signed a declaration of intent on closer cooperation; on 6 June 1989, an agreement followed between the responsible German and French ministers. German nuclear power operators could thereby dispense with their own industrial reprocessing plant.
German fuel, plutonium and waste
According to the German Federal Environment Ministry, 5,359 tonnes of spent fuel assemblies from German nuclear power stations were transported to La Hague between 1973 and 2005. The plutonium separated during reprocessing was used, among other things, to manufacture MOX fuel assemblies, which were subsequently used again in German reactors. They were initially manufactured in Hanau as well; after production there ended, manufacturing took place at plants abroad, including Dessel in Belgium and facilities in France.
Reprocessing also produced highly radioactive fission-product solutions and other contaminated residues. The liquid waste was incorporated into glass and solidified in containers; metallic fuel cladding fragments and structural components were compacted and packaged. The contracts provided for the return of waste attributable to the German fuel.
The first shipment of vitrified reprocessing waste from La Hague reached Gorleben in May 1996. Until the last shipment in November 2011, the CASTOR trains were accompanied by extensive police operations and repeatedly prompted large protests. Waste still awaiting return was subsequently allocated to interim storage facilities at former nuclear power station sites. On 20 November 2024, the final four casks from La Hague reached the Philippsburg interim storage facility. The return of all German high-level reprocessing waste from France and the United Kingdom was completed in June 2026, with a shipment from Sellafield.
What a reprocessing plant leaves behind
Even during normal operation, La Hague produces highly radioactive vitrified waste, compacted fuel cladding fragments, contaminated plant materials and other types of waste. Within regulatory limits, the plant releases radioactive substances into the air and water. Discharges into the sea in particular have been controversial for decades and are subject to regulatory monitoring and inspection.
The site's long operational history is evident in its oldest buildings. Some waste stored in the former UP2-400 plant and its ancillary facilities was not conditioned at the time of its creation in the form now required. Retrieving and processing it presents substantial technical difficulties. The French regulator also points to the 1981 fire in Silo 130, which caused contamination. Timetables for dismantling several older facilities have slipped into the 2040s. Fuel continues to be reprocessed in the newer plants, while another part of the site has been undergoing dismantling for years.
- Funktion
- Wiederaufarbeitung (PUREX), mehrere Werke (UP2-400, UP2-800, UP3-A)
- Betreiber
- Orano (Nachfolger von COGEMA und Areva)
- Aus Deutschland angeliefert
- 5.359 t Brennelemente1973–2005
UP2-400
- Betriebsbeginn
- 1966
- Status
- endgültig stillgelegt seit 1.1.2004; Rückbau
UP2-800 und UP3-A
- Genehmigte Kapazität
- 1.700 t Uran und Plutonium im Brennstoff vor Bestrahlung/Jahrbeide Werke zusammen
- Function
- Reprocessing (PUREX), multiple plants (UP2-400, UP2-800, UP3-A)
- Operator
- Orano (successor to COGEMA and Areva)
- Delivered from Germany
- 5,359 t of fuel assemblies1973–2005
UP2-400
- Start of operation
- 1966
- Status
- permanently shut down since 1 January 2004; dismantling in progress
UP2-800 and UP3-A
- Licensed capacity
- 1,700 t of uranium and plutonium in fuel before irradiation per yearcombined limit for both plants