KERNKRAFTWERK TRILLO

TRILLO NUCLEAR POWER PLANT

Das Kernkraftwerk Trillo am Tajo in der spanischen Provinz Guadalajara ist ein Druckwasserreaktor der deutschen Kraftwerk Union. Es ging 1988 in Betrieb und blieb der einzige Reaktor deutscher Bauart in Spanien. Obwohl die Konstruktion aus Deutschland stammte, wurde der größte Teil des Kraftwerks von spanischen Unternehmen errichtet. Die Betriebsgenehmigung läuft derzeit bis November 2034.

Trillo Nuclear Power Plant, on the River Tagus in the Spanish province of Guadalajara, is a pressurised water reactor built by Germany's Kraftwerk Union. It entered service in 1988 and remains the only German-designed reactor in Spain. Although its design came from Germany, most of the power station was built by Spanish companies. Its operating licence currently runs until November 2034.

Deutsche Technik am Tajo

Am Oberlauf des Tajo, nahe dem kastilischen Ort Trillo, entstand ab 1979 eines der letzten Kernkraftwerke des spanischen Ausbauprogramms. Die erste Standortgenehmigung von 1975 sah noch zwei Reaktorblöcke vor. Im Februar 1979 zogen sich zwei ursprünglich beteiligte Energieunternehmen aus dem Projekt zurück; die Gesellschaft Unión Eléctrica übernahm es zunächst allein. Der zweite Block Trillo II gehörte später zu den fünf spanischen Reaktorprojekten, die der Nationale Energieplan 1983–1992 im Rahmen des sogenannten Atom-Moratoriums aussetzte – neben den beiden Blöcken von Lemóniz und Valdecaballeros. 1994 wurde die endgültige Aufgabe dieser Projekte gesetzlich beschlossen; die Betreiber erhielten Entschädigungen für ihre Investitionen. Gebaut wurde in Trillo nur Block I.

Den Reaktor lieferte die deutsche Kraftwerk Union. Der Reaktor besitzt drei Primärkreisläufe und 177 Brennelemente, entsprechend der von der KWU auch für Gösgen verwendeten Dreischleifenlinie. Das Kraftwerk hat eine thermische Leistung von 3.010 Megawatt und erzeugt gut 1.000 Megawatt elektrische Nettoleistung.

Ein weitgehend spanischer Bau

Der Anlagenlieferant stammte aus Deutschland, der Großteil der Arbeiten wurde jedoch im eigenen Land ausgeführt. Nach Angaben des Betreibers entfielen 85 Prozent der Investition auf spanische Leistungen; bei Ingenieurarbeiten und Ausrüstung lag der inländische Anteil über 80 Prozent, während Bauarbeiten und Montage vollständig von spanischen Firmen übernommen wurden. Die Kosten überschritten 280 Milliarden Peseten.

Am 14. Mai 1988 wurde der Reaktor erstmals kritisch, am 23. Mai erstmals mit dem öffentlichen Stromnetz verbunden. Am 6. August begann der kommerzielle Leistungsbetrieb. Damit ging Trillo im selben Jahr ans Netz wie die deutschen Konvoi-Blöcke Isar 2 und Emsland, obwohl sein Bau bereits drei Jahre früher begonnen hatte.

Spaniens erstes Trockenlager

Das Kraftwerk besitzt ein geschlossenes Kühlsystem mit Naturzugkühltürmen; das dafür benötigte Wasser stammt aus dem Tajo. Ein zweites Merkmal der deutschen Reaktorauslegung wurde später für die Entsorgung bedeutsam: Das Abklingbecken ließ sich nicht in gleichem Maß wie bei anderen spanischen Anlagen durch dichter gepackte Lagergestelle erweitern. Deshalb benötigte Trillo als erstes spanisches Kernkraftwerk ein eigenes Trockenlager für abgebrannte Brennelemente. Es nahm 2002 den Betrieb auf. Die in Spanien entwickelten und gefertigten Metallbehälter dienen sowohl der Lagerung als auch einem möglichen späteren Transport.

Im November 2024 verlängerte das spanische Energieministerium die Betriebsgenehmigung bis zum 16. November 2034. Grundlage war die sicherheitstechnische Überprüfung durch den spanischen Consejo de Seguridad Nuclear. Trillo gehört damit auch Jahrzehnte nach dem Ende des Kernkraftwerksneubaus in Deutschland zu den weiter betriebenen Exportanlagen der Kraftwerk Union.

German technology on the Tagus

Construction began in 1979 near the Castilian town of Trillo, on the upper reaches of the Tagus, on one of the last nuclear power stations in Spain's expansion programme. The initial site permit, issued in 1975, envisaged two reactor units. In February 1979, two of the electricity companies originally involved withdrew from the project, leaving Unión Eléctrica as its sole participant for the time being. The second unit, Trillo II, subsequently became one of five Spanish reactor projects suspended under the 1983–1992 National Energy Plan as part of the country's so-called nuclear moratorium, alongside both units at Lemóniz and Valdecaballeros. In 1994, legislation formally cancelled these projects and provided compensation to the operators for their investments. Only Unit I was built at Trillo.

The reactor was supplied by Germany's Kraftwerk Union. It has three primary coolant loops and 177 fuel assemblies, following the three-loop design that KWU also used at Gösgen. The plant has a thermal output of 3,010 megawatts and generates just over 1,000 megawatts of net electrical power.

Built largely in Spain

Although the plant supplier came from Germany, most of the work was carried out domestically. According to the operator, Spanish goods and services accounted for 85 per cent of the investment. The domestic share of engineering and equipment exceeded 80 per cent, while construction and installation were carried out entirely by Spanish firms. Costs exceeded 280 billion pesetas.

The reactor first achieved criticality on 14 May 1988 and was connected to the public grid for the first time on 23 May. Commercial operation began on 6 August. Trillo thus came online in the same year as the German Konvoi units Isar 2 and Emsland, although its construction had begun three years earlier.

Spain's first dry storage facility

The power station uses a closed-cycle cooling system with natural-draught cooling towers; the necessary water comes from the Tagus. Another feature of the German reactor design later became important for spent-fuel management: the spent-fuel pool could not be expanded with more closely spaced storage racks to the same extent as those at other Spanish plants. Trillo therefore became the first Spanish nuclear power station to require its own dry storage facility for spent fuel. It began operation in 2002. The metal casks, developed and manufactured in Spain, are intended both for storage and for possible later transport.

In November 2024, Spain's Ministry of Energy extended the operating licence until 16 November 2034. The decision was based on a safety review by the Spanish nuclear regulator, the Consejo de Seguridad Nuclear. Decades after the end of nuclear power station construction in Germany, Trillo thus remains one of Kraftwerk Union's export plants still in operation.

Technische EckdatenKey facts
Reaktortyp
Druckwasserreaktor
Hersteller
Kraftwerk Union (KWU)
Betreiber
Centrales Nucleares Almaraz-Trillo, A.I.E. (CNAT)
Leistung thermisch
3.010 MW
Leistung elektrisch
1.066 / 1.003 MW (historische Angaben)
Primärkreisläufe
3
Brennelemente
177
Baubeginn
17.8.1979
Erstkritikalität
14.5.1988
Netzanschluss
23.5.1988
Kommerzieller Betrieb
6.8.1988
Status
in Betrieb
Kühlung: Naturzugkühltürme
Betriebsgenehmigung: bis 16.11.2034
Trockenlager: seit 2002

Betreiber

Die Kraftwerksgesellschaften gründeten im November 1999 die gemeinsame Betriebsorganisation CNAT für Almaraz und Trillo. Trillo ist ein KWU-Druckwasserreaktor; die Beteiligungen der vier Energieunternehmen sind von der Betriebsorganisation zu unterscheiden.

Technische EckdatenKey facts
Reactor type
Pressurised water reactor
Manufacturer
Kraftwerk Union (KWU)
Operator
Centrales Nucleares Almaraz-Trillo, A.I.E. (CNAT)
Thermal output
3,010 MW
Electrical output
1,066 / 1,003 MW (historical figures)
Primary loops
3
Fuel assemblies
177
Construction started
17 August 1979
First criticality
14 May 1988
Grid connection
23 May 1988
Commercial operation
6 August 1988
Status
operating
Cooling: natural-draught cooling towers
Operating licence: until 16 November 2034
Dry storage facility: since 2002

Operator

In November 1999, the power companies established CNAT as a joint operating organisation for Almaraz and Trillo. Trillo is a KWU pressurised water reactor; the ownership interests of the four electricity companies should be distinguished from the operating organisation.

Glossar:Glossary:

Druckwasserreaktor (DWR)

Leichtwasserreaktor, in dem Wasser unter einem Druck von etwa 150 bis 160 bar durch den Reaktorkern strömt, ohne dort zu sieden. Es kühlt die Brennelemente und bremst als Moderator die Neutronen. Über Dampferzeuger gibt der geschlossene Primärkreislauf seine Wärme an einen getrennten Sekundärkreislauf ab, dessen Dampf die Turbine antreibt. Die beiden Wasserkreisläufe vermischen sich nicht; im Normalbetrieb bleibt das radioaktive Reaktorkühlmittel vom Turbinenkreislauf getrennt. Ein Druckhalter stabilisiert den Druck im Primärkreislauf.

Das Konzept wurde in den USA zunächst für den Antrieb von U-Booten entwickelt. Unter Leitung von Hyman G. Rickover entstand bei Westinghouse der Reaktor für die USS Nautilus, die 1954 in Dienst gestellt wurde und 1955 erstmals mit Kernenergie fuhr. Im Kraftwerk Shippingport ging 1957 ein Druckwasserreaktor zur Stromerzeugung ans Netz. Siemens übernahm die amerikanische Technik; die Kraftwerk Union (KWU) entwickelte daraus die westdeutsche Linie bis zum Konvoi. Dessen Entwicklung floss zusammen mit der französischen N4-Baureihe in den Europäischen Druckwasserreaktor EPR ein. Die sowjetischen und russischen WWER bilden eine eigenständige Druckwasserreaktorlinie – auf der Karte vertreten durch Rheinsberg, Greifswald und das nicht fertiggestellte Kernkraftwerk Stendal.

Glossar:Glossary:

Pressurised Water Reactor (PWR)

A light-water reactor in which water flows through the reactor core at a pressure of approximately 150–160 bar without boiling. It cools the fuel assemblies and acts as a moderator, slowing the neutrons. The closed primary circuit transfers its heat through steam generators to a separate secondary circuit, whose steam drives the turbine. The water in the two circuits does not mix; under normal operating conditions, the radioactive reactor coolant remains separate from the turbine circuit. A pressuriser stabilises the pressure in the primary circuit.

The concept was originally developed in the United States for submarine propulsion. Under the direction of Hyman G. Rickover, Westinghouse developed the reactor for the USS Nautilus, which entered service in 1954 and made its first nuclear-powered voyage in 1955. A pressurised water reactor at Shippingport began supplying electricity to the grid in 1957. Siemens adopted the American technology; Kraftwerk Union (KWU) developed it into the West German reactor line culminating in the Konvoi. Together with the French N4 series, this design development contributed to the European Pressurised Reactor (EPR). The Soviet and Russian WWER reactors represent an independent pressurised water reactor line, represented on the map by Rheinsberg, Greifswald and the unfinished Stendal nuclear power station.