GORLEBEN

1977 wurde Gorleben im niedersächsischen Wendland als Standort eines Nuklearen Entsorgungszentrums ausgewählt. Die Wiederaufarbeitungsanlage wurde nicht gebaut, doch es entstanden zwei Zwischenlager, eine Pilotkonditionierungsanlage und ein Erkundungsbergwerk im Salzstock. Das Bergwerk wird nach dem Ausschluss Gorlebens aus der Endlagersuche 2020 verfüllt; die Zwischenlager bleiben in Betrieb.

In 1977, Gorleben in the Wendland region of Lower Saxony was selected as the site of a nuclear waste management centre. The reprocessing plant was never built, but two interim storage facilities, a pilot conditioning plant and an exploratory mine in a salt dome were constructed. Following Gorleben's exclusion from the search for a final repository in 2020, the mine is being backfilled; the interim storage facilities remain in operation.

Anlagen am Standort:Facilities at the site:

Ein Entsorgungszentrum an der Elbe

Am 22. Februar 1977 gab Niedersachsens Ministerpräsident Ernst Albrecht die Entscheidung für Gorleben bekannt. Im Wendland nahe der innerdeutschen Grenze sollte ein Nukleares Entsorgungszentrum entstehen: mit Wiederaufarbeitung abgebrannter Brennelemente, weiterer Behandlung des gewonnenen Materials, Zwischenlagerung und einem Endlager im Salzstock Gorleben-Rambow. Ein gemeinsamer Standort sollte den Weg des Kernbrennstoffs vom Reaktor bis zur endgültigen Entsorgung schließen.

Gorleben war keine zunächst feststehende geologische Wahl. Bei der vorausgehenden Standortsuche der KEWA war der Ort zeitweise wegen seiner Lage in einer Erholungslandschaft ausgeschieden. Die niedersächsische Vorauswahl stellte ihn später neben andere Kandidaten. Für die Landesregierung spielten neben technischen Kriterien auch Flächenverfügbarkeit und strukturpolitische Erwägungen eine Rolle. Die Entscheidung löste im Landkreis Lüchow-Dannenberg unmittelbar Widerstand aus, besonders unter Landwirten, deren Grundstücke für das Vorhaben gebraucht wurden.

Vom 25. bis zum 31. März 1979 zogen Gegner des Projekts mit Traktoren aus dem Wendland nach Hannover. Während des Trecks ereignete sich am 28. März im amerikanischen Kernkraftwerk Three Mile Island ein schwerer Reaktorunfall. Am 16. Mai 1979 erklärte Albrecht die geplante Wiederaufarbeitungsanlage in Gorleben für politisch nicht realisierbar. Die Suche nach einem Endlager im Salzstock und die Planung oberirdischer Einrichtungen gingen weiter. Am 3. Mai 1980 besetzten Atomkraftgegner die Bohrstelle 1004 und errichteten das Hüttendorf „Republik Freies Wendland“, das am 4. Juni von der Polizei geräumt wurde.

Vier Anlagen, vier Aufgaben

Auf dem Gelände entstanden das Abfall-Zwischenlager für schwach- und mittelradioaktive Abfälle und das Transportbehälterlager für bestrahlte Brennelemente und hochradioaktive Rückstände der Wiederaufarbeitung. Die Pilotkonditionierungsanlage (PKA) sollte Brennelemente für eine direkte Endlagerung umpacken; sie nahm den vorgesehenen Betrieb nie auf. Südöstlich der Zwischenlager, auf einem eigenen Betriebsgelände, wurde das Erkundungsbergwerk in den Salzstock vorgetrieben.

Mit den ersten hochradioaktiven Behältern im Jahr 1995 wurde Gorleben auch zum Ziel großer CASTOR-Transporte. 2017 übernahm die bundeseigene Gesellschaft für Zwischenlagerung (BGZ) das Brennelemente-Zwischenlager und das Abfall-Zwischenlager, 2019 auch die PKA. Das Erkundungsbergwerk liegt in der Verantwortung der Bundesgesellschaft für Endlagerung (BGE).

Die BGE schloss den Salzstock am 28. September 2020 auf Grundlage der geowissenschaftlichen Abwägungskriterien aus der neuen bundesweiten Endlagersuche aus. Die unterirdischen Anlagen werden seit November 2024 mit dem zuvor geförderten Salz verfüllt. Die Zwischenlager bleiben in Betrieb: Für die hochradioaktiven Abfälle hat die BGZ 2026 eine Verlängerung der Aufbewahrungsgenehmigung über 2034 hinaus beantragt.

A nuclear waste management centre on the Elbe

On 22 February 1977, Lower Saxony's Minister-President Ernst Albrecht announced the decision in favour of Gorleben. A nuclear waste management centre was to be built in the Wendland region near the border between East and West Germany, comprising the reprocessing of spent nuclear fuel, further treatment of the recovered materials, interim storage and a final repository in the Gorleben–Rambow salt dome. Bringing these facilities together at one site was intended to complete the route taken by nuclear fuel from the reactor to its final disposal.

Gorleben had not been an obvious geological choice from the outset. During KEWA's earlier site search, it had at one stage been ruled out because of its location in a recreational landscape. Lower Saxony's subsequent shortlist placed it alongside other candidates. In addition to technical criteria, land availability and regional economic policy considerations played a part in the state government's decision. The announcement immediately prompted opposition in the Lüchow-Dannenberg district, particularly among farmers whose land was needed for the project.

Between 25 and 31 March 1979, opponents of the project travelled by tractor from the Wendland to Hanover. During the protest convoy, on 28 March, a serious reactor accident occurred at the American Three Mile Island nuclear power station. On 16 May 1979, Albrecht declared that the planned reprocessing plant at Gorleben was politically unfeasible. The search for a final repository in the salt dome and plans for above-ground facilities continued. On 3 May 1980, anti-nuclear protesters occupied borehole site 1004 and established the hut settlement known as the “Free Republic of Wendland”, which the police cleared on 4 June.

Four facilities, four purposes

The site acquired a waste interim storage facility for low- and intermediate-level radioactive waste and a transport cask storage facility for spent nuclear fuel and high-level residues from reprocessing. The Pilot Conditioning Plant (PKA) was intended to repackage fuel assemblies for direct final disposal; it never entered its intended operating mode. To the south-east of the storage facilities, on separate operational premises, an exploratory mine was excavated into the salt dome.

With the arrival of the first high-level radioactive waste casks in 1995, Gorleben also became a destination for large CASTOR shipments. In 2017, the federally owned BGZ Gesellschaft für Zwischenlagerung took over the spent fuel interim storage facility and the waste interim storage facility, followed by the PKA in 2019. The exploratory mine is the responsibility of the Bundesgesellschaft für Endlagerung (BGE), the federal company responsible for radioactive waste disposal.

On 28 September 2020, the BGE excluded the salt dome from the renewed nationwide search for a final repository, on the basis of geoscientific assessment criteria. Since November 2024, the underground workings have been backfilled with salt previously extracted from the mine. The interim storage facilities remain in operation: in 2026, BGZ applied to extend the storage licence for high-level radioactive waste beyond 2034.

EckdatenKey factsNiedersachsen · Landkreis Lüchow-Dannenberg · Standortentscheidung 22.02.1977 · Abfall-Zwischenlager seit 1984 · Brennelemente-Zwischenlager seit 1995 · PKA ohne heißen Konditionierungsbetrieb · Erkundungsbergwerk in Schließung
EckdatenKey factsLower Saxony · Lüchow-Dannenberg district · Site selected 22 February 1977 · Waste interim storage since 1984 · Spent fuel interim storage since 1995 · PKA without hot conditioning operations · Exploratory mine undergoing closure