PILOTKONDITIONIERUNGSANLAGE GORLEBEN
GORLEBEN PILOT CONDITIONING PLANT
Die Pilotkonditionierungsanlage Gorleben sollte bestrahlte Brennelemente zerlegen und die Brennstäbe für eine direkte Endlagerung in POLLUX-Behälter verpacken. Die 1990 begonnene Anlage wurde fertiggestellt, nahm aber den vorgesehenen Konditionierungsbetrieb nie auf. Seit einer Genehmigung von 2000 wird sie nur für eine mögliche Reparatur schadhafter Lagerbehälter vorgehalten.
The Gorleben Pilot Conditioning Plant was intended to dismantle spent fuel assemblies and package their fuel rods in POLLUX containers for direct geological disposal. Construction began in 1990 and the plant was completed, but it never entered its intended conditioning operation. Under a licence issued in 2000, it has been kept available solely for the possible repair of damaged storage containers.
Als Gorleben noch als künftiger Endlagerstandort galt, entstand hier auch eine Anlage zur Vorbereitung abgebrannter Brennelemente für die Endlagerung. Die Pilotkonditionierungsanlage (PKA) war für Arbeiten ausgelegt, die wegen der Strahlung nur hinter Abschirmwänden und mit fernbedienter Technik möglich sind. Ein Brennelement sollte geöffnet, seine Brennstäbe entnommen, gebündelt und in einen POLLUX-Endlagerbehälter eingebracht werden.
Die Deutsche Gesellschaft zur Wiederaufarbeitung von Kernbrennstoffen (DWK) beantragte 1986 die Errichtung. Nach der ersten Teilgenehmigung vom 30. Januar 1990 begann der Bau des Konditionierungsgebäudes. 1994 wurde die technische Ausstattung und ihre Erprobung genehmigt. Zur Anlage gehören abgeschirmte Arbeitszellen, Fernhantierungstechnik, Versorgungsräume und ein hoher Abluftkamin. Zu den beteiligten Industrieunternehmen gehörte Babcock Noell. Als Durchsatz waren bis zu 35 Tonnen Schwermetall pro Jahr vorgesehen; aus den deutschen Kernkraftwerken fielen damals jährlich rund 400 bis 500 Tonnen Schwermetall in bestrahlten Brennelementen an.
Am 14. Juni 2000 verständigten sich Bundesregierung und Energiewirtschaft auf den Atomkonsens; die Vereinbarung wurde 2001 förmlich unterzeichnet. Am 19. Dezember 2000 erteilte Niedersachsen die dritte Teilgenehmigung einschließlich der Betriebsgenehmigung. Entsprechend der Vereinbarung wurde die Nutzung jedoch auf die Reparatur schadhafter Transport- und Lagerbehälter beschränkt. Die geplante Zerlegung bestrahlter Brennelemente fand nie statt. Die dafür errichtete Heiße Zelle blieb frei von betriebsbedingter radioaktiver Kontamination.
Mit der Neuordnung der Zwischenlagerung ging die PKA 2019 von der bisherigen Gorlebener Betreibergesellschaft auf die bundeseigene BGZ über. Ihre spätere Demontage ist vorgesehen. Dafür muss zunächst ein anderes Konzept für eine gegebenenfalls notwendige Reparatur oder Wiederherstellung der Transportfähigkeit der in Gorleben gelagerten Behälter genehmigt und organisatorisch abgesichert sein. Die Anlage bleibt deshalb bisher in einem Bereitschaftszustand, obwohl ihre ursprüngliche Aufgabe mit dem Ausschluss des Salzstocks aus der Endlagersuche 2020 entfiel.
When Gorleben was still envisaged as a future repository site, a facility was also built there to prepare spent nuclear fuel for disposal. The Pilot Conditioning Plant (PKA) was designed for work that, because of the radiation, could only be carried out behind shielding walls using remotely operated equipment. A fuel assembly would be opened, its fuel rods removed and bundled, and the bundle placed in a POLLUX disposal container.
Deutsche Gesellschaft zur Wiederaufarbeitung von Kernbrennstoffen (DWK) applied for permission to construct the plant in 1986. Construction of the conditioning building began following the first partial licence of 30 January 1990. The technical equipment and its testing were approved in 1994. The plant comprises shielded work cells, remote-handling equipment, service rooms and a tall ventilation stack. Babcock Noell was among the industrial contractors involved. The design throughput was up to 35 tonnes of heavy metal per year; at the time, German nuclear power plants were producing around 400 to 500 tonnes of heavy metal annually in spent fuel assemblies.
On 14 June 2000, the federal government and electricity industry agreed on the nuclear phase-out consensus, formally signed in 2001. On 19 December 2000, Lower Saxony granted the third partial licence, including the operating licence. In accordance with the agreement, however, use of the plant was restricted to the repair of damaged transport and storage containers. The planned dismantling of spent fuel assemblies never took place. The hot cell built for that purpose remained free of contamination from operational use.
Following the reorganisation of interim storage, the PKA was transferred in 2019 from the previous Gorleben operating company to the federally owned BGZ. Its eventual dismantling is planned. Before this can happen, an alternative arrangement for any necessary repairs or restoration of transportability of the containers stored at Gorleben must be licensed and put in place. The plant has therefore remained on standby, even though its original purpose became obsolete when the Gorleben salt dome was excluded from the repository search in 2020.
- Funktion
- Pilotanlage zur Konditionierung hochradioaktiver Brennelemente
- Geplante Kapazität
- bis zu 35 t Schwermetall/JahrAuslegungswert, nie als Produktion erreicht
- Antrag und Teilgenehmigungen
- Antrag 1986; Teilgenehmigungen 1990, 1994, 2000 (dritte einschließlich Betriebsgenehmigung, Dezember 2000)
- Betrieb
- kein heißer Konditionierungsbetrieb mit Brennelementen
- Heute
- Stand-by für die Behälterwartung
- Function
- Pilot plant for conditioning high-level radioactive spent fuel
- Planned capacity
- up to 35 t heavy metal/yeardesign capacity, never achieved as production
- Application and partial licences
- application in 1986; partial licences in 1990, 1994 and 2000 (third licence included operating authorisation, December 2000)
- Operation
- no active conditioning operation with spent fuel
- Present condition
- on standby for container maintenance